Transilien Line V
Appearance
You can help expand this article with text translated from the corresponding article in French. (December 2023) Click [show] for important translation instructions.
|
Line V | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Connecting lines | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 7 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Commuter rail | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Transilien | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | SNCF | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Depot(s) | Trappes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | Z 5600 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 4 December 2023 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 15 km (9.3 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | Overhead line, 1,500 V DC | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Transilien Line V is a railway line serving the southwestern part of Île-de-France. It connects Versailles-Chantiers and Massy-Palaiseau. It belongs to the Transilien network operated by SNCF, the French national railway. Unlike the other Transilien lines (with the exception of Line U), Line V lies completely outside the city limits of Paris.
Before December 2023, the line was operated as a branch of RER C. On 4 December 2023, the line was separated from the RER C and became a shuttle line, in preparation for the opening of the T12 Express tramway line on 10 December 2023.[2]
Chronology
- 1 May 1883: Opening of the railway line between Juvisy and Versailles-Chantiers.
- 1992: Integration of the Juvisy–Versailles-Chantiers line into RER C.
- 4 December 2023: The shuttle line V is created by separating the line between Massy-Palaiseau and Versailles-Chantiers from the RER C, in preparation for the opening of the T12 Express tramway line.[2]
See also
References
- ^ "Map for journeys by wheelchair users" (PDF). Île-de-France Mobilités (in French and British English). Paris: Région Île-de-France. 11 May 2023. Archived from the original (PDF) on 13 July 2023. Retrieved 13 July 2023.
- ^ a b "RER C: The Massy Palaiseau - Versailles Chantiers branch becomes line V". Île-de-France Mobilités (in French). Paris: Région Île-de-France. 5 December 2023. Archived from the original on 6 December 2023. Retrieved 6 December 2023.