S. S. Fabrication: Quotation

This document is a quotation from S.S. Fabrication providing rates for various construction works including structure glazing, aluminum composite panels, MS work, and spider glass. It outlines the scope of work, rates, payment terms, and specifications for structure glazing starting at Rs. 360/sqft, aluminum composite paneling from Rs. 210/sqft, and spider glass canopy installation at Rs. 1025/sqft. The payment terms include an initial 50% advance, with 30% after framing, 10% after glass installation, and the final 10% after completion.

Uploaded by

Ranit Mukherjee
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
488 views2 pages

S. S. Fabrication: Quotation

This document is a quotation from S.S. Fabrication providing rates for various construction works including structure glazing, aluminum composite panels, MS work, and spider glass. It outlines the scope of work, rates, payment terms, and specifications for structure glazing starting at Rs. 360/sqft, aluminum composite paneling from Rs. 210/sqft, and spider glass canopy installation at Rs. 1025/sqft. The payment terms include an initial 50% advance, with 30% after framing, 10% after glass installation, and the final 10% after completion.

Uploaded by

Ranit Mukherjee
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

S. S.

FABRICATION
ALL KINDS OF A.C.P & STRUCTURE GLASSING,
SPIDER FITTINGS, WINDOW, DOOR & ETC.
Office : 1, Kumar Para Bye Lane, Telinipara 712125,Contact No. - 9903459230
Email ID:- Sam0072012@[Link]

QUOTATION
M/S.
ESHA MADEM JI
V I P Road, Tagoria, beside Uma medical,
Kolkata (W B)
Sub: AULLMINUM COMPOSIT PANNEL, STURCTUR GLAZING, SPIDER GLASS, MS WORK:Sir.
1-

2-

We are pleased to offer our best rates accompanied by details specification for your
SS Structure glazing, A. C.P. Sheet work, Spider glass, M S work at the mentioned site.

STRURCTURE GLAZING;Supply, fabrication & fixing ADARSH Structure Glazing Silicone, masking tape and Anker Fishnet
Screw, ADARSH weather Silicon, M S Bracket, Nut bolt, 6mmx10mm bubal tape & 50mmX50mm
Caution Wall Section, 19mmX19mmSub frame tube, 6mm/5mm toughen Glass as par available &
all necessary job work in your side.
Rate per sqft.

Rs. = 360/-

Totel sqft 2000 epoxy met x360

Rs =720,000/-approx

STRURCTURE GLAZING;Supply, fabrication & fixing ADARSH Structure Glazing Silicone, masking tape and Anker Fishnet
Screw, ADARSH weather Silicon, M S Bracket, Nut bolt, 6mmx10mm bubal tape & 50mmX50mm
Caution Wall Section, 19mmX19mmSub frame tube, old glass fixing in your site & All necessary job
work in your side.
Rate per sqft.

Rs. = 260/-

Totel sqft = 600 epoxy met x260

Rs =156,000/-approx

3 (A) ALUMINUM COMOPSITE PANEL SHEET:


Supply fabrication& fixing M S Bracket, ADARSH Weather Silicon, screw, nut bolt, Masking
Tape, Fishnet,1X1.5 Aluminum Tube & Angel, 3mm A CP Sheet (Running Color), and all
necessary job working in your side.
Rate per sqft=

Rs =210/-

Totel sqft = 200 epoxy met x210

Rs =42,000/-Approx

(B) Aluminum composite sheet (WOODEN COLOR)


Rate per sqft=

Rs =280/-

3- M S WORK:Supply fabrication and fixing M S Tube75mm X75 mm and Angel and all necessary job
work in your site.

Rate per Kg=

Rs =105/-

4- SPIDER GLASS / DOUBLE PESTED GLASS:Supply fabrication & fixing Spider /Double glass (Canopy) m s structure and glass fixing
Spider fighting, weather silicone and all necessary job work in your side.
Rate pur sqft

Rs = 1025/-

Total sqft =200 epoxy met X 1025


5-

Rs = 205,000/- approx

PADDING (SKY FOLDING ) HAS BE TO DUN FROM THE CLINT SIDE.


Note:- RATE PLUS VAT
Terms and Condition :1:

Taxes if any would be extra and will be as per actual (paid by client side)

2 :

Final billing will be done as per actual measurement. The width less then one foot will be
considered one feet.

3 :

Work completion the from the date of confirmed advance and work order .

4 :

Wiper, storage of materials and electricity has to be provided by the client free of cost.

5 :

Police and other legalities will be on the client side.


Payment details

(a)

Advance 50% (total value of project) with work order.

(b)

30% (Total value of project) after framing.

(c)

10% (Total value of project) after framing Glass.

(e)

10% after completion of the work after one week.


Specification of the above as per the total area rates finalized will be calculated later
on looking forward for a positive response and further discussion with you on the above.
Mention subject.
your faith fully.
Shyam Sunder Chaudhary