HVAC Ducting Inspection Test Record

This document contains inspection and test records for the leak test of ductwork in the JA WHP area at Block 5 Al Shaheen Field Development. It includes: 1) A pre-checksheet and leak test record documenting the inspection and leak test of supply air duct LTP-JA-SA-ETR-01 with a measured leakage rate of 97.32 L/s. 2) A list of 12 duct sections that make up the supply air ductwork with tag numbers, dimensions, material thickness and flange details. 3) Sign-offs by PVD Tech and PTSC MC witnessing a successful leak test to 500Pa on the ETR supply air duct with a

Uploaded by

Tham Phong
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
140 views19 pages

HVAC Ducting Inspection Test Record

This document contains inspection and test records for the leak test of ductwork in the JA WHP area at Block 5 Al Shaheen Field Development. It includes: 1) A pre-checksheet and leak test record documenting the inspection and leak test of supply air duct LTP-JA-SA-ETR-01 with a measured leakage rate of 97.32 L/s. 2) A list of 12 duct sections that make up the supply air ductwork with tag numbers, dimensions, material thickness and flange details. 3) Sign-offs by PVD Tech and PTSC MC witnessing a successful leak test to 500Pa on the ETR supply air duct with a

Uploaded by

Tham Phong
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

GLF3-H14-HVAC Ducting,

Piping & Other Bulk Material

MC INSPECTION & TEST RECORD

LEAK TEST PACK


TEST PACK NO.: LTP-JA-SA-ETR-01

CONTENT

1. TEST PACK INFORMATION

2. PRE-CHECKSHEET & LEAK TEST RECORD

3. D&ID / BOUNDARY & LIST OF DUCT


4. HVAC DUCTING SHOP DRAWING
5. HVAC DUCTING SUPPORT DRAWING
6. EQUIPMENT CERTIFICATED
7. PUNCH LIST
JA HVAC TEST PACK LIST REGISTER
Project Name: Block 5 Al Shaheen Field Development
Package :GLF3-H14-HVAC Ducting, Piping & Other Bulk Material
DWG No.: ASJAA-10-14108-0001-JA WHP HVAC DUCTING SHOP DRAWING REV.03

INFORMATION

No Leak Test Package Name Location Max Duct Pressure Test Proposed Pressure Test Duration Remark

1 LTP-JA-SA-ETR-01 ETR ROOM MAIN DECK JA WHP +379.0 500 15

2 LTP-JA-SA-ITR ITR ROOM MAIN DECK JA WHP -492.0 500 15

3 LTP-JA-SA-OR REST ROOM CELLAR DECK JA WHP +390.0 500 15

4 LTP-JA-RA-ETR ETR ROOM MAIN DECK JA WHP -510.0 500 15

5 LTP-JA-RA-ITR ITR ROOM MAIN DECK JA WHP -492.0 500 15

6 LTP-JA-FA-MD MAIN DECK JA WHP +379.0 500 15

PREPARED BY PVD Tech QA/QC PVD Tech PTSC MC NOC

Name

Sign
Date
GLF3-H14-HVAC Ducting,
Piping & Other Bulk Material

MC INSPECTION & TEST RECORD

2. PRE-CHECKSHEET & LEAK TEST


RECORD
Block 5 Al Shaheen Field Development
MC Inspection & Test Record
Ductwork Installation H14 Sheet 1 of 1 Rev 00

INFORMATION
Tag number LTP-JA-SA-ETR-01 Description Leak test System

System SUPPLY AIR DUCT Description

Sub System TBA Description

Deck / Location JA WHP - MD - UNDER RAISE FLOOR P&ID No / D&ID ASJAA-10-H14108-0001

No Description OK N/A PL
1 Inspection Checklist
1.01 Ductwork complete, satisfactory and in accordance with design drwaings and location correct.
1.02 Confirm duct work is free damage.
1.03 Joints and sealants correct and duct work internally cleaned.
1.04 Flanges secure, sealed and bolts tight.
1.05 Stiffening and turning vanes corectly installed.
1.06 Access door location clearly identified, fastened and sealed.
Confirm anti-vibration and resilient supports secure and in accordance with manufaturers instructions /
1.07
Specifications.
1.08 Confirm all instrument devices have been installed as per approved drawing.
1.09 Confirm all inlet & outlet flexible joints and fans are installed as per approved drawing.
1.10 Confirm all louvers, attenuators, filters and associated dampers are installed, funtional and in the open position.
1.11 Confirm all duct work joints and seam are completed.
1.12 Check supports are correctly installed.
1.13 Confirm pressure/leakage test has been completed.
1.14 Confirm earth bonding is completed.
1.15 Test points adequate
Confirm insulations is correctly applied and undamaged - insulation should not be applied until
1.16
pressure/leaktest is complete excepting internal insulation.
1.17 Complete and attach "Red line marks up" Drawings as required. If no change mark as "No Change"
Comments:

Completed By Verified / Approved by Witnessed / Reviewed by


Company PVD Tech PTSC M&C NOC
Name

Signature

Date
Block 5 Al Shaheen Field Development
Inspection & Test Record
Ductwork Leak Test H14 Sheet 1 of 1 Rev 00

Information
Tag number LTP-JA-SA-ETR-01 Description Leak test System

System SUPPLY AIR DUCT Description

Sub System TBA Description

Deck / Location JA WHP - MD - UNDER RAISE FLOOR Reference Drawing ASJAA-10-H14108-0001

Ductwork Leak Test Information


Physical Details
Record the following: a) Section under test: 1000x550mm
ETR-Supplyand 700x550mm
air duct below raise floor
b) Surface area of duct under test:___63.61m2____ c) Test static pressure:______500Pa________
1
d) Leakage factor:__1.53___L/S per m2 e) Max. permitted leakage (b x d):_____97.32_L/S_______
f) Pressure Classification:______Class A_______
Test Details
2 Record range of test device:______0-1000Pa________________
3 Record duct static pressure reading:_______________
4 Record flow test reading:_______________________
5 Actual air flow leakage rate l/s:___________________
6 Duration of test (Minimum 15 minutes):___________
7 Type of flow device:__________________________
Record Technical Details
8 Length (meters):_________24.56m_____________________
9 Width/Depth/Diameter (mm): 1000x550mm and 700x550mm
10 Periphery (mm):______________________________
11 Area (m2):________________63.61m2___________________
Test Equipment Data
Make:ORIFLOW Model: CORBA Serial No: N/A Cal. Expiry Date: 12/6/2025
Model: ORIFICE PLATE
Make:ORIFLOW Serial No: 027022 Cal. Expiry Date: 12/6/2025
76mm
Comments:

Completed By Verified / Approved by Witnessed / Reviewed by


Company PVD Tech PTSC M&C NOC
Name

Signature

Date
1000x550 and 700x550
ETR-Supply air duct below raise floor
500
63.61
1.53
97.32
GLF3-H14-HVAC Ducting,
Piping & Other Bulk Material

MC INSPECTION & TEST RECORD

3. D&ID / BOUNDARY & LIST OF DUCT


Block 5 Al Shaheen Field Development
Inspection & Test Record
LIST OF DUCT H14 Sheet 1 of 1 Rev 00

Information

Tag number LTP-JA-SA-ETR-01 Description Leak test System

System SUPPLY AIR DUCT Description

Sub System TBA Description


JA WHP - MD - UNDER RAISE Reference
Deck / Location ASJAA-10-H14108-0001
FLOOR Drawing

SIZE (mm) Duct FLANGE AREA


No TAG NO. MODEL Q'ty
X Y L Thk.
(mm) A B (m2)
1 JA-01-SUP-004-SL-01 SL 1 1300 300 500 3.0 L80x80x5 L80x80x5 1.6
2 JA-01-SUP-005-SL-01 SL 1 1300 300 500 3.0 L80x80x5 L80x80x5 1.6
3 JA-01-SUP-006-SL-01 SL 1 1300 300 500 3.0 L80x80x5 L80x80x5 1.6
4 JA-01-SUP-006-SL-02 SL 1 1300 300 360 3.0 L80x80x5 L80x80x5 1.152
5 JA-01-SUP-001-SL-01 SL 1 700 550 2000 1.15 L50x50x5 L50x50x5 5
6 JA-01-SUP-001-SL-02 SL 1 700 550 920 1.15 L50x50x5 L50x50x5 2.3
7 JA-01-SUP-001-SL-03 SL 1 700 550 1000 1.15 L50x50x5 L50x50x5 2.5
8 JA-01-SUP-001-SL-04 SL 1 700 550 1500 1.15 L50x50x5 L50x50x5 3.75
9 JA-01-SUP-001-SL-05 SL 1 700 550 1500 1.15 L50x50x5 L50x50x5 3.75
10 JA-01-SUP-001-SL-06 SL 1 700 550 1500 1.15 L50x50x5 L50x50x5 3.75
11 JA-01-SUP-001-SL-07 SL 1 700 550 700 1.15 L50x50x5 L50x50x5 1.75
12 JA-01-SUP-003-SL-01 SL 1 200 200 580 1.0 L40x40x3 L40x40x3 0.464
13 JA-01-SUP-003-EL-01 EL 1 200 200 100 1.0 L40x40x3 L40x40x3 0.251
14 JA-01-SUP-003-SL-02 SL 1 200 200 1200 1.0 L40x40x3 L40x40x3 0.960
15 JA-01-SUP-001-TR-01 TR 1 700 550 700 1.15 L50x50x5 L50x50x5 1.96
16 JA-01-SUP-002-TR-01 TR 1 700 500 450 1.15 L50x50x5 L50x50x5 0.945
17 JA-01-SUP-001-DF-01 DF 1 1000 550 1750 3 L50x50x5 L80x80x5 5.425
18 JA-01-SUP-001-DF-02 DF 1 1000 550 3450 3 L50x50x5 L80x80x5 10.695
19 JA-01-SUP-001-DF-03 DF 1 1000 550 2000 1.5 L50x50x5 L50x50x5 6.2
20 JA-01-SUP-001-DF-04 DF 1 700 550 1950 1.5 L50x50x5 L50x50x5 4.875
21 JA-01-SUP-002-DF-01 DF 1 550 550 1400 1.5 L50x50x5 L50x50x5 3.08
Sum : 63.607

Length : 24.56
Comments:
- Materials GALV. Z275
- ETR room

Completed By Verified / Approved by Witnessed / Reviewed by


Company PVD Tech PTSC M&C NOC
Name

Signature

Date
NOTES
03
1. 2X100% FRESH AIR INTAKE IS COMMON FOR ALL ACUS.

2. SUPPLY AIR TO ELECTRICAL TECHNICAL ROOM AND


M M
INSTRUMENT TECHNICAL ROOM SHALL BE UNDER
SLOPE 1:100 SEE DETAIL AIR LOCK ROOM SLOPE 1:100 RAISE FLOOR.

3. ETR AND ITR ACU SUPPLY AIR DUCT RUN UNDER


RAISE FLOOR.

ELECTRICAL INSTRUMENT 4. OBD DAMPER SHALL BE PROVIDED FOR EACH


TECHNICAL ROOM (FLOOR AIR GRILLE 600x600 17 NOS. ) To TECHNICAL ROOM (FLOOR AIR GRILLE 600x600 10NOS. )
AIRLOCK GRILLE/DIFFUSER/FLOOR AIR GRILLE.
(+50 Pa) M ID M M M ID
(+50 Pa)
SUPPLY AIR DUCT BRANCH-OFF RISE TO HIGH
LEVEL SERVING AIR LOCK & BATTERY ROOM 5. ALL PDIT, HT, TIT MUST BE INSTALLED AT EYE LEVEL
03 LOCATION TO ENSURE PROPER READING.

6. ALL EQUIPMENT/INSTRUMENT TAGGING SHALL BE


REFERRED TO WHP03-PMC2-ASJAA-11-200001-0001 JA
: LTP-JA-SA-ETR-01 WHP HVAC EQUIPMENT & INSTRUMENT LIST.

7. ALL TYPE OF EQUIPMENT DETAIL IN D&ID WILL BE


ADDED FOR AFC REVISION ONCE TAG & COMPONENT
PER TYPE ARE FROZEN.
M M SUPPLY AIR DUCT RUN
UNDER RAISE FLOOR
8. VENDOR SHALL BE RESPONSIBLE FOR VERIFYING AND
M M M
DEVELOPING COMPONENTS/INSTRUMENTATIONS
THAT MAKE THE HVAC SYSTEM AND EQUIPMENTS
M
WORK PROPERLY.
03
M M M M

M
9. DUCT LENGTH & SIZE FOR OUTDOOR AIR SHALL BE
A60 DESIGN TO MITIGATE THE RISK OF HAZARDOUS GAS
FROM ENTERING IN TO THE ROOMS.
03
M M A60
SUPPLY AIR DUCT RUN
UNDER RAISE FLOOR M 10. LOUVER SHALL BE INSTALLED BEFORE ALL PRESSURE
SUPPLY AIR DUCT M
ID
BATTERY RELIEF DAMPERS.
DROPS TO BELOW
SERVING REST ROOM A60
M M ROOM M M
A60
(+30 Pa)
11. ALL GOOSE NECK AND OUTDOOR INLET SHALL BE
SUPPLY AIR DUCT BRANCH-OFF RISE TO HIGH
WITH PREVENTABLE WIRE MESH.
LEVEL SERVING REST ROOM

JA TECHNICAL BUILDING - MAIN DECK : LTP-JA-SA-ETR

M M

ASJAA-11-360001-0001 JA WHP HVAC SINGLE LINE DIAGRAM FOR HVAC DUCTING SHEET 01
03 ASJAA-11-360001-0002 JA WHP HVAC SINGLE LINE DIAGRAM FOR HVAC DUCTING SHEET 02
M M ASJAA-11-360001-0003 JA WHP HVAC SINGLE LINE DIAGRAM FOR HVAC DUCTING SHEET 03
ASJAA-11-360001-0004 JA WHP HVAC SINGLE LINE DIAGRAM FOR HVAC DUCTING SHEET 04
03 ASJAA-11-020001-0001 JA WHP HVAC BLOCK DIAGRAM SHEET 01
ASJAA-11-020001-0002 JA WHP HVAC BLOCK DIAGRAM SHEET 02
ASJAA-11-020001-0003 JA WHP HVAC BLOCK DIAGRAM SHEET 03
ASJAA-11-020001-0004 JA WHP HVAC BLOCK DIAGRAM SHEET 04
ASJAA-11-270001-0001 JA WHP HVAC PIPING & INSTRUMENTATION DIAGRAM (P&ID) SHEET 01
ASJAA-11-270001-0002 JA WHP HVAC PIPING & INSTRUMENTATION DIAGRAM (P&ID) SHEET 02
A60 ASJAA-11-270001-0003 JA WHP HVAC PIPING & INSTRUMENTATION DIAGRAM (P&ID) SHEET 03
M M ASJAA-11-270001-0004 JA WHP HVAC PIPING & INSTRUMENTATION DIAGRAM (P&ID) SHEET 04
M ASJAA-11-270001-0005 JA WHP HVAC PIPING & INSTRUMENTATION DIAGRAM (P&ID) SHEET 05

AIRLOCK
M
(+30 Pa)

DETAIL AIR LOCK ROOM


SUPPLY AIR DUCT DROPS FROM 03 22/06/2022 AFC ACCEPTED FOR CONSTRUCTION NTB QT/DDT NQN
ABOVE SERVING REST ROOM 02 10/03/2022 AFC ACCEPTED FOR CONSTRUCTION NTB QT/DDT NQN
01 28/10/2021 IFA ISSUED FOR ACCEPTANCE NTB QT/DDT NQN

JA AIR LOCK ROOM - MAIN DECK 00 05/08/2021 IFR ISSUED FOR REVIEW NTB QT/DDT NQN

REST ROOM / TOILET


(+30 Pa) WHP03-PMC2-ASJAA-11-620001-0004
GLF-WHP03-EPCI5

JA WHP HVAC DUCT AND INSTRUMENTATION


DIAGRAM (D&ID) SHEET 04
JA RESTROOM/TOILET - CELLAR DECK
DID 12 DE 1

NONE A1 ASJAA-11-620001-0004 000 03


NOC-QA_BORDER_A1H_01_A
GLF3-H14-HVAC Ducting,
Piping & Other Bulk Material

MC INSPECTION & TEST RECORD

4. HVAC DUCTING SHOP DRAWING


TRUE
PLATFORM
NORTH
NOTES
NORTH
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHER NOTED
2. FOLLOWING DOCUMENTS SHALL BE REFEREED FURTHER,
A B a) SD-NOC-HVA-801 : TERMINOLOGY, DEFINITIONS AND
ABBREVIATIONS
b) SD-NOC-HVA-803 : SYMBOLS FOR P&ID AND D&ID
A1 B1 3.
c) SD-NOC-HVA-830 : TYPICALS HVAC P&ID AND D&ID
INSTRUMENTS ARE SHOWN IN P&ID AND D&ID SHEETS.
4. 2x100% FRESH AIR INTAKE IS COMMON FOR BOTH ACUs.
5. SUPPLY AIR DUCTS FOR ETR AND ITR RUNS UNDER FALSE
FLOOR AND RETURN AIR DUCT RUNS AT TOP LEVEL.
6. BATTERY ROOM SUPPLY AIR SHALL BE AT LOWER LEVEL AND
EXHAUST SHALL BE AT HIGHER LEVEL.
7. DUCT SHALL BE INSULATED AS BELOW AS MINIMUM
REQUIREMENT:
1A a) OUTDOOR SUPPLY AIR DUCT 50MM
b) INDOOR SUPPLY AIR DUCT 30MM
c) INDOOR FRESH AIR DUCT 50MM
d) OUTDOOR EXHAUST AIR DUCT 30MM
2975 5525 5430 3160 1390 2000 4020 8500 e) OUTDOOR FRESH AIR DUCT EXPOSED TO SOLAR 30MM
8. NO INSULATION IS REQUIRED FOR INDOOR EXHAUST/RETURN DUCT
9. ALL GRILLES AND DIFFUSERS SHALL BE PROVIDED WITH
ELECTRICAL
UP
INSTRUMENT OPPOSED BLADE DAMPER (OBD).
TECHNICAL ROOM 10. THE HVAC CC PANEL IS LOCATED IN ITR AND TWO DUCT HEATER PANELS ARE
TECHNICAL ROOM
JA201 LOCATED IN EACH ITR AND ETR SHOWING IN DOCUMENTS:
ASJAA-SAG-128104 JA202 ASJAA-08-190001-0001 AND ASJAA-07-190002-001
985x535 Connect to ACUs 11. THE TEST HOLES OF THIS POSITION IS LOCATED AT BOTTOM OF DUCT.
ASJAA-SAG-128102 1300x300 12. THE TEST HOLES OF THIS POSITION IS LOCATED AT VERTICAL SIDE OF DUCT.
Plenum box 1000x550 13. THE QUANTITY/DETAIL OF TEST HOLE, WIRE MESH, ACCESS DOOR, END CAP
985x535
WILL BE REFERRED TO WHP03-PMC2-ASYYY-10-H14199-0001
ASJAA-SAG-128103 Plenum box 1000x550 JA & KA WHP - HVAC Ducting & Piping Construction Standards.
985x535 14. DETAIL FOR ALL TEST HOLE,WIRE MESH, ACCESS DOOR,END CAP,WILL BE
JA-01-SUP-001-DF-04 REFERRED TO WHP03-PMC2-ASYYY-10-H14199-0001 JA & KA WHP -HVAC DUCTING &
PIPING CONSTRUCTION STANDARDS.
JA-01-SUP-002-DF-01
JA-01-SUP-006-SL-01
550x550
JA-01-SUP-001-SL-07
700x550
03 B.O.D. 22808
ASJAA-VCD-120011
250 E
M
A
N
E
M
A
N JA-01-SUP-006-EL-01
JA-01-SUP-006-SL-02 LEGEND / ABBREVIATION:
B.O.D. 22808
760
H H (SEE SHT.021) 1. DUCT PENETRATION C/W FIRE INSULATION
JA-01-SUP-001-EL-01
200x200 c/w cladding A60
Go down JA-01-SUP-001-DF-01
503 2. B.O.D : BELLOW OF DUCT
DUCTING

INSULATION

1 E
M
A
N B.O.D. XXXXX

3. MAINTENANCE AREA ABB. DESCRIPTION


SL STRAIGHT DUCT PART
EL ELBOW
TR TRANSFORMATION
DF DIVIDED FLOW BRANCHES
SUPPLY AIR DUCT - UNDER RAISED FLOOR - ELETRICAL TECHNICAL ROOM - MAIN DECK RO RECTANGULAR DUCT OFFSET

FROM EL. (+) 23800 TO EL. (+) 22500 ABB. DESCRIPTION COLOR CODE
A B SUP SUPPLY DUCT (ESSENTIAL)
EHA EXHAUST DUCT (ESSENTIAL)

A1 B1 OAD
RCA
FRESH AIR DUCT
RECIRCULATION DUCT (ESSENTIAL)
- INSULATION FOR SUPPLY DUCT
- INSULATION FOR OUTDOOR AIR DUCT
3125 5088 - INSULATION FOR EXHAUST AIR DUCT

1A END CAP
SEE TABLE DETAIL
JA-02-SUP-002-DF-01
700x300 INSTRUMENT ASJAA-11-080003-0004 JA WHP HVAC DUCT ROUTING DRAWING
ELECTRICAL B.O.D. 22850 AND EQUIPMENT LAYOUT SHEET 04
TECHNICAL ROOM TECHNICAL ROOM
ASJAA-SAG-128111 JA202 ASJAA-11-080003-0003 JA WHP HVAC DUCT ROUTING DRAWING
JA201 1035x285 AND EQUIPMENT LAYOUT SHEET 03
UP ASJAA-11-080003-0002 JA WHP HVAC DUCT ROUTING DRAWING
AND EQUIPMENT LAYOUT SHEET 02
Drawing No. Description
ASJAA-SAG-128104 ASJAA-VCD-120021
Reference Drawings
ASJAA-SAG-128112 ACESS DOOR
Plenum box 1000x550 250x300
1035x285 see note 13
ASJAA-SAG-128103
END CAP
END CAP
SEE TABLE DETAIL
SEE TABLE DETAIL
250 03 15/08/2022 AFC ACCEPTED FOR CONSTRUCTION TPD YDD TDT
02 08/06/2022 AFC ACCEPTED FOR CONSTRUCTION DPT YDD TDT

ASJAA-VCD-120011
E
M
A
N
E
M
A
N JA-02-SUP-001-DF-03 ASJAA-A-1214 ASJAA-A-1215 01
00
17/05/2022 AFC ACCEPTED FOR CONSTRUCTION
14/03/2022 IFR ISSUED FOR REVIEW
DPT
DPT
YDD
YDD
TDT
TDT
ASJAA-SAG-128132
215x215 Rev. Date Sta. Description Issued Reviewed Approved
200x250 by by by
Go down
200x200 c/w cladding E
M
A
N ASJAA-SAG-128131
Go down 215x215
ACESS DOOR
300x300
MP Project Drawing No.
WHP03-PMC2-ASJAA-10-H14108-0001
E
M
A
N E
M
A
N E
M
A
N E
M
A
N GLF-WHP03-EPCI5
1 The information contained in this document is the proprietary to North Oil Company. It must not be reproduced,
stored, disclosed to any third party or used for any purpose not authorized by North Oil Company
Title
2155
JA WHP HVAC DUCTING SHOP DRAWING
SUPPLY AIR DUCT - UNDER RAISED FLOOR - INSTRUMENT TECHNICAL ROOM - MAIN DECK
FROM EL. (+) 23800 TO EL. (+) 22500 Doc Type
DRW
S/Syst.
12
Originator Drawing Number Phase
DE
Class
2
Scale Size Drawing No. Folio Rev.
1:75 A3 ASJAA-10-H14108-0001 009 03
NOC-QA_BORDER_A1H_01_A
GLF3-H14-HVAC Ducting,
Piping & Other Bulk Material

MC INSPECTION & TEST RECORD

5. HVAC DUCTING SUPPORT


DRAWING
NOTES

PLATFORM
TRUE NORTH
NORTH A1 A B B1

1A

A1 A B B1

1A

1
WHP03-PMC2-ASJAA-10-H14108-0003
GLF-WHP03-EPCI5

JA WHP-DETAIL DUCT SUPPORT


SHOP DRAWING - GENERAL LAYOUT

DRW 12 DE 2

NONE A3 002 03
NOC-QA_BORDER_A1H_01_A
GLF3-H14-HVAC Ducting,
Piping & Other Bulk Material

MC INSPECTION & TEST RECORD

6. EQUIPMENT CERTIFICATED
GLF3-H14-HVAC Ducting,
Piping & Other Bulk Material

MC INSPECTION & TEST RECORD

7. PUNCH LIST
Piping Check List

PUNCH LIST
Sub-system : JAA_LSPS_1209 - Ducting System for ETR/Rest Room
TestPack Number : LTP-JA-SA-ETR-01 Description
TYPE: HVAC GALV. Ducting Module : JA Topside
DISCIPLINES: HVAC User Group :
PUNCH LIST No.: Date:
COMPLETION ACCEPTANCE
PTSC NOC
Item No. Line No Sheet Rev CAT CLEARANCE DATE SIGN. DATE SIGN.

CATEGORIES:
'A' ITEMS TO BE REPAIRED, COMPLETED BEFORE FLUSHING/ HYDROTEST
'B' ITEMS THAT CAN BE REPAIRED, COMPLETED BEFORE COMMISSIONING/ OPERATING
Carried Out By Accepted By
CTR CONST CPY CONST CTR COM CPY COM Certifying Authority

Signature

Name
Date