HVAC Ducting Inspection Test Record
HVAC Ducting Inspection Test Record
CONTENT
INFORMATION
No Leak Test Package Name Location Max Duct Pressure Test Proposed Pressure Test Duration Remark
Name
Sign
Date
GLF3-H14-HVAC Ducting,
Piping & Other Bulk Material
INFORMATION
Tag number LTP-JA-SA-ETR-01 Description Leak test System
No Description OK N/A PL
1 Inspection Checklist
1.01 Ductwork complete, satisfactory and in accordance with design drwaings and location correct.
1.02 Confirm duct work is free damage.
1.03 Joints and sealants correct and duct work internally cleaned.
1.04 Flanges secure, sealed and bolts tight.
1.05 Stiffening and turning vanes corectly installed.
1.06 Access door location clearly identified, fastened and sealed.
Confirm anti-vibration and resilient supports secure and in accordance with manufaturers instructions /
1.07
Specifications.
1.08 Confirm all instrument devices have been installed as per approved drawing.
1.09 Confirm all inlet & outlet flexible joints and fans are installed as per approved drawing.
1.10 Confirm all louvers, attenuators, filters and associated dampers are installed, funtional and in the open position.
1.11 Confirm all duct work joints and seam are completed.
1.12 Check supports are correctly installed.
1.13 Confirm pressure/leakage test has been completed.
1.14 Confirm earth bonding is completed.
1.15 Test points adequate
Confirm insulations is correctly applied and undamaged - insulation should not be applied until
1.16
pressure/leaktest is complete excepting internal insulation.
1.17 Complete and attach "Red line marks up" Drawings as required. If no change mark as "No Change"
Comments:
Signature
Date
Block 5 Al Shaheen Field Development
Inspection & Test Record
Ductwork Leak Test H14 Sheet 1 of 1 Rev 00
Information
Tag number LTP-JA-SA-ETR-01 Description Leak test System
Signature
Date
1000x550 and 700x550
ETR-Supply air duct below raise floor
500
63.61
1.53
97.32
GLF3-H14-HVAC Ducting,
Piping & Other Bulk Material
Information
Length : 24.56
Comments:
- Materials GALV. Z275
- ETR room
Signature
Date
NOTES
03
1. 2X100% FRESH AIR INTAKE IS COMMON FOR ALL ACUS.
M
9. DUCT LENGTH & SIZE FOR OUTDOOR AIR SHALL BE
A60 DESIGN TO MITIGATE THE RISK OF HAZARDOUS GAS
FROM ENTERING IN TO THE ROOMS.
03
M M A60
SUPPLY AIR DUCT RUN
UNDER RAISE FLOOR M 10. LOUVER SHALL BE INSTALLED BEFORE ALL PRESSURE
SUPPLY AIR DUCT M
ID
BATTERY RELIEF DAMPERS.
DROPS TO BELOW
SERVING REST ROOM A60
M M ROOM M M
A60
(+30 Pa)
11. ALL GOOSE NECK AND OUTDOOR INLET SHALL BE
SUPPLY AIR DUCT BRANCH-OFF RISE TO HIGH
WITH PREVENTABLE WIRE MESH.
LEVEL SERVING REST ROOM
M M
ASJAA-11-360001-0001 JA WHP HVAC SINGLE LINE DIAGRAM FOR HVAC DUCTING SHEET 01
03 ASJAA-11-360001-0002 JA WHP HVAC SINGLE LINE DIAGRAM FOR HVAC DUCTING SHEET 02
M M ASJAA-11-360001-0003 JA WHP HVAC SINGLE LINE DIAGRAM FOR HVAC DUCTING SHEET 03
ASJAA-11-360001-0004 JA WHP HVAC SINGLE LINE DIAGRAM FOR HVAC DUCTING SHEET 04
03 ASJAA-11-020001-0001 JA WHP HVAC BLOCK DIAGRAM SHEET 01
ASJAA-11-020001-0002 JA WHP HVAC BLOCK DIAGRAM SHEET 02
ASJAA-11-020001-0003 JA WHP HVAC BLOCK DIAGRAM SHEET 03
ASJAA-11-020001-0004 JA WHP HVAC BLOCK DIAGRAM SHEET 04
ASJAA-11-270001-0001 JA WHP HVAC PIPING & INSTRUMENTATION DIAGRAM (P&ID) SHEET 01
ASJAA-11-270001-0002 JA WHP HVAC PIPING & INSTRUMENTATION DIAGRAM (P&ID) SHEET 02
A60 ASJAA-11-270001-0003 JA WHP HVAC PIPING & INSTRUMENTATION DIAGRAM (P&ID) SHEET 03
M M ASJAA-11-270001-0004 JA WHP HVAC PIPING & INSTRUMENTATION DIAGRAM (P&ID) SHEET 04
M ASJAA-11-270001-0005 JA WHP HVAC PIPING & INSTRUMENTATION DIAGRAM (P&ID) SHEET 05
AIRLOCK
M
(+30 Pa)
JA AIR LOCK ROOM - MAIN DECK 00 05/08/2021 IFR ISSUED FOR REVIEW NTB QT/DDT NQN
INSULATION
1 E
M
A
N B.O.D. XXXXX
FROM EL. (+) 23800 TO EL. (+) 22500 ABB. DESCRIPTION COLOR CODE
A B SUP SUPPLY DUCT (ESSENTIAL)
EHA EXHAUST DUCT (ESSENTIAL)
A1 B1 OAD
RCA
FRESH AIR DUCT
RECIRCULATION DUCT (ESSENTIAL)
- INSULATION FOR SUPPLY DUCT
- INSULATION FOR OUTDOOR AIR DUCT
3125 5088 - INSULATION FOR EXHAUST AIR DUCT
1A END CAP
SEE TABLE DETAIL
JA-02-SUP-002-DF-01
700x300 INSTRUMENT ASJAA-11-080003-0004 JA WHP HVAC DUCT ROUTING DRAWING
ELECTRICAL B.O.D. 22850 AND EQUIPMENT LAYOUT SHEET 04
TECHNICAL ROOM TECHNICAL ROOM
ASJAA-SAG-128111 JA202 ASJAA-11-080003-0003 JA WHP HVAC DUCT ROUTING DRAWING
JA201 1035x285 AND EQUIPMENT LAYOUT SHEET 03
UP ASJAA-11-080003-0002 JA WHP HVAC DUCT ROUTING DRAWING
AND EQUIPMENT LAYOUT SHEET 02
Drawing No. Description
ASJAA-SAG-128104 ASJAA-VCD-120021
Reference Drawings
ASJAA-SAG-128112 ACESS DOOR
Plenum box 1000x550 250x300
1035x285 see note 13
ASJAA-SAG-128103
END CAP
END CAP
SEE TABLE DETAIL
SEE TABLE DETAIL
250 03 15/08/2022 AFC ACCEPTED FOR CONSTRUCTION TPD YDD TDT
02 08/06/2022 AFC ACCEPTED FOR CONSTRUCTION DPT YDD TDT
ASJAA-VCD-120011
E
M
A
N
E
M
A
N JA-02-SUP-001-DF-03 ASJAA-A-1214 ASJAA-A-1215 01
00
17/05/2022 AFC ACCEPTED FOR CONSTRUCTION
14/03/2022 IFR ISSUED FOR REVIEW
DPT
DPT
YDD
YDD
TDT
TDT
ASJAA-SAG-128132
215x215 Rev. Date Sta. Description Issued Reviewed Approved
200x250 by by by
Go down
200x200 c/w cladding E
M
A
N ASJAA-SAG-128131
Go down 215x215
ACESS DOOR
300x300
MP Project Drawing No.
WHP03-PMC2-ASJAA-10-H14108-0001
E
M
A
N E
M
A
N E
M
A
N E
M
A
N GLF-WHP03-EPCI5
1 The information contained in this document is the proprietary to North Oil Company. It must not be reproduced,
stored, disclosed to any third party or used for any purpose not authorized by North Oil Company
Title
2155
JA WHP HVAC DUCTING SHOP DRAWING
SUPPLY AIR DUCT - UNDER RAISED FLOOR - INSTRUMENT TECHNICAL ROOM - MAIN DECK
FROM EL. (+) 23800 TO EL. (+) 22500 Doc Type
DRW
S/Syst.
12
Originator Drawing Number Phase
DE
Class
2
Scale Size Drawing No. Folio Rev.
1:75 A3 ASJAA-10-H14108-0001 009 03
NOC-QA_BORDER_A1H_01_A
GLF3-H14-HVAC Ducting,
Piping & Other Bulk Material
PLATFORM
TRUE NORTH
NORTH A1 A B B1
1A
A1 A B B1
1A
1
WHP03-PMC2-ASJAA-10-H14108-0003
GLF-WHP03-EPCI5
DRW 12 DE 2
NONE A3 002 03
NOC-QA_BORDER_A1H_01_A
GLF3-H14-HVAC Ducting,
Piping & Other Bulk Material
6. EQUIPMENT CERTIFICATED
GLF3-H14-HVAC Ducting,
Piping & Other Bulk Material
7. PUNCH LIST
Piping Check List
PUNCH LIST
Sub-system : JAA_LSPS_1209 - Ducting System for ETR/Rest Room
TestPack Number : LTP-JA-SA-ETR-01 Description
TYPE: HVAC GALV. Ducting Module : JA Topside
DISCIPLINES: HVAC User Group :
PUNCH LIST No.: Date:
COMPLETION ACCEPTANCE
PTSC NOC
Item No. Line No Sheet Rev CAT CLEARANCE DATE SIGN. DATE SIGN.
CATEGORIES:
'A' ITEMS TO BE REPAIRED, COMPLETED BEFORE FLUSHING/ HYDROTEST
'B' ITEMS THAT CAN BE REPAIRED, COMPLETED BEFORE COMMISSIONING/ OPERATING
Carried Out By Accepted By
CTR CONST CPY CONST CTR COM CPY COM Certifying Authority
Signature
Name
Date