0% found this document useful (0 votes)
63 views4 pages

Essential Requirement For OJT Training Project

Uploaded by

Aous H
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
63 views4 pages

Essential Requirement For OJT Training Project

Uploaded by

Aous H
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Electrical Maintenance Group 1 & 2 OJT requirements at CPF3 Workshop

Relevant Core
Skills Core Ref. Description
Requirements for OJT Effective Skills

C1.3 Power Generation


C1.3.55 to C1.3.69
15 Standby and emergency Complete Tool Box for Electrical
C1.4 Generator Technicians including a Multimeter
C1.4.14 to C1.4.18
5
C1.5 Substations Equipment
C1.5.41 to C1.5.53
Megger
13
C1.6 Transformers
Cable lugs Crimping Tool (Manual/ Hydraulic)
C1.6.41 to C1.6.53
13
Brg. Puller (Manual and Hydraulic)
C1.8 Power Cables
C1.8.31 to C1.8.40

Transformer Oil Breakdown Voltage Tester


10 (BDV)
C1.9 Switch Gears
C1.9.10 to C1.9.13 # Pieces of redundant Power Cables (New
4 and Old) of short lengths, types, voltage
levels single and multiple number of cores
C2.1 AC & DC Motors
C2.1.39 to C2.1.47 # Circuit Breakers, and Contactors of
9 different voltage levels, sizes and types
Variable Speed Drive
C2.2 (VSD)
# Control relays with bases (used or new)
C2.2.17 to C2.2.22
6 # Operable Thermal Overload relay with heat
C2.3 Motorized Valves (MOV's)elements
C2.3.18 to C2.3.22 # Different types and sizes of bearings (Used
5 and New ones)
C2.4 Lighting and small power # Different types and sizes of new cable lugs,
C2.4.20 to C2.4.25 terminals and joining sleeves
6 Electrical workshop # Cotton rags and grease hand cleaners
C2.5 Equipment 7 Procedures (GoJo) or similar
C2.5.15 to C2.5.19 Redundant scrapped Motors of any rating
5 Electrical Protection Low and voltage level
C3.1 Voltage
C3.1.17 to C3.1.26
10 Earthing System & Power Transformer (Redundant or even
C3.3 Lighning Protection faulty)
C3.3.16 to C3.3.21
Power Transformer (Redundant or even
faulty)

6 Insulation for Low


C3.4 Voltage
C3.4.11 to C3.4.12
2 Battery and Battery # Termination and Jointing New Kits for
C3.5 Chargers Power Cables (LV & HV)
C3.5.16 to C3.5.20
5 Power supplies & UPS
C3.6 System
C3.6.13 to C3.6.18
6
C3.7 Solar Power System
C3.7.9 to C3.7.12
4
C3.8 Solar Power System
C3.8.9 to C3.8.11
3

127 Total Core Elements of a Competancy Level (SKILLS)


591 Total Core Elements of a Competancy Level (Awareness, Knowledge & Skills)
21.50% Percentage of Skills to the total Core elements
at CPF3 Workshop

Remarks
Notes
This is to be handed
over to the Trainer as
a custody and shall be tools in the workshop door number 2
and in the chinees offeice we had used
returned back by the it
end of the Training
Project

Megger is available with


chinees&Maintenance team we used it
These specific tools/ during inssulation test of H.P. gas
devices shall be on compressor ,cable lugs in Workshop we
request only (for max. of used it during test of
three separate day trainees ,transformer in workshop as in
within every 2 weeks) live and easy to use it as in case of
according to its switch off will not effect the
availability process .the Bearing removal with
mechanichal team, oil tester in cpf2
and maintetnce team workshop

in workshop

These material and


equipments badly in workshop
required to be located in
the PCF3 Workshop and
remained for the
ongoing Training Project
and later on for further
Training purposes

Motors could be kept


inside side the workshop

Transformer could be
located out side OR
inside side the workshop
depends on PCH
permission
in workshop
Transformer could be
located out side OR
inside side the workshop
depends on PCH
permission
in workshop

These Kits are only for


demonstration and
training purpose and could be simulation for different level
shall be kept as spare in of voltage and cable sizes
the electrical workshop

could be simulation for different level


of voltage and cable sizes

could be simulation for different level


of voltage and cable sizes

owledge & Skills)

You might also like