0% found this document useful (0 votes)
9 views15 pages

Bản sao của TACN2

The document contains a series of questions and fill-in-the-blank prompts related to international trade, shipping, and contracts. It covers topics such as types of bills of lading, delivery dates, force majeure events, and the principles of letters of credit. Additionally, it includes translation tasks for specific passages into Vietnamese and English.

Uploaded by

Thảo Nguyễn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views15 pages

Bản sao của TACN2

The document contains a series of questions and fill-in-the-blank prompts related to international trade, shipping, and contracts. It covers topics such as types of bills of lading, delivery dates, force majeure events, and the principles of letters of credit. Additionally, it includes translation tasks for specific passages into Vietnamese and English.

Uploaded by

Thảo Nguyễn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

khó quá k biết làm nữa đâu

29 tôi tưởng advising bank


cop phần dịch V-E đi. đúng câu hôm trc cô giang cho làm
1.
Which of the following is NOT a type of B/L
(1 Point)

Combined Transport Bill of Lading

Ship Assignment Note

Rail consignment note

Airway Bill
2.
Which of the following orders is appropriate?
(1 Point)

Effective date -> Date of signature -> Delivery date.

Date of payment -> Date of signature -> Delivery date.

Date of execution -> Date of delivery -> Date of coming into force.

Date of conclusion -> Effective date -> Delivery date.


3.
Which of the following is NOT likely to be the date of delivery?
(1 Point)

The date of dispatch from the factory.

The date of loading onto a ship

The date when the goods should arrive at the port of discharge.

The date of contract coming into force.


4.
Inland transport can made by
(1 Point)

Barge

Mail

Rail

All of the above


5.
Which of the following dates is the date of signing the contract?
(1 Point)

Date of approval

Date of becoming effective

Date of inspection

Date of execution
6.
Which of the following is true about the date of coming into force?
(1 Point)

The date on which the last precondition of contract has been met.

The date on which goods are delivered

The date on which contract is signed.

The date on which the Buyer effects all payments.


7.
What will happen if either of the parties fails to meet preconditions?
(1 Point)
B. The party which meets the preconditions shall be compensated.

A. The contract becomes valid no matter what happens.

D. The party which does not meet the preconditions shall be penalized.

C. The contract will become null and void.


8.
The delivery date
(1 Point)

D. can be fixed for a certain number of days before the effective date.

A. can be fixed for a certain number of days before the date of conclusion.

B. can be any day on the calendar after the effective date.

C. can be any day between the date of execution and the effective date.
9.
Cut- off date
(1 Point)

C. is the date by which both parties have to meet all preconditions to make the contract
effective.

A. does not apply to fixed-price contract.

B. allows both parties to extend the validity of the contract.

D. is the date on which delivery must be effected.


10.
“Time is of essence” clause
(1 Point)

A. allows the Seller to cancel the contract when failing to meet the delivery.
D. makes late delivery excusable.

C. entitles the Seller to make late delivery.

B. entitles the Buyer to reject the Goods in case of late delivery.


11.
Grace period
(1 Point)

B. is the period in which both parties are unable to perform their duties due to Force
Majeure events.

A. aims to give both parties extra time to perform their duties without being penalized.

C. is the period between the date of conclusion of the contract and the effective date.

D. is the period between the date of conclusion of the contract and the date of delivery.
12.
Which of the following is NOT an example of a Force Majeure event?
(1 Point)

B. Pandemic

A. Lockdown

C. Newly introduced government regulation

D. Monsoon rain
13.
Damages
(1 Point)

C. are the destruction of the ship in transit.

D. are the sums of money paid by the Seller to insurance company.


A. are sums of money paid to compensate for the injured party.

B. are the loss of the goods in transit.


14.
Delays occur in a …grace…………… period tend to be excusable
(1 Point)
15.
Combined Transport is the shipment involving
(1 Point)

ship only

train only

air only

more than one mode of transport


16.
Which of the following is true about the cut-off date?
(1 Point)

It is always included in a contract with a flexible price.

It is always included in a contract with a fixed price.

It has nothing to do with the validity of the contract.

It is mandatory in all contracts.


17.
Which of the following is NOT marked on the container of a
consignment
(1 Point)

Lifting position

Material
Net weight

Number of package
18.
Which of the following questions is NOT likely to be raised by the
Courts when deciding the amount of compensation?
(1 Point)

D. Did the seller take out an insurance for the Goods?

C. Did the buyer take reasonable steps to keep the loss as small as possible?

B. Was the loss reasonably close to the breach in the chain of events?

A. Did the loss provably follow from the breach?


19.
Penalty aims
(1 Point)

C. to relieve the importer of liability for delayed payment.

D. to urge the exporter to make punctual delivery.

A. to compensate the buyer fairly to any delay in delivery.

B. to recover the financial loss due to Force Majeure events.


20.
Which of the following is NOT true about Liquidated Damages?
(1 Point)

D. It is subject to increase or decrease in some legal systems.

A. It is not enforceable countries which introduce common law.

C. It aims to compensate the buyer fairly for any late delivery.


B. It is calculated during the formation of a contract.
21.
Which of the following is true of liquidated damages?
(1 Point)

It is usually set after the damage is calculated.

It is usually set in advance.

It is always fixed.

It is appliable in a limited number of countries


22.
Who might bear the cost of export credit insurance?
(1 Point)

A. The buyer

D. The beneficiary

C. The seller

B. The guarantor
23.
Which of the following factors does not affect the insurance premium?
(1 Point)

B. The creditworthiness of the buyer

C. The stability of the buyer’s country

A. The type of the goods

D. The terms of payment


24.
Which of the following is true about the place of delivery?
(1 Point)

D. Place of delivery is the point at which the Seller passes responsibility for the Goods to
the Buyer.

A. Place of delivery is always the destination of the goods.

B. Place of delivery is the Seller’ plant when Goods are delivered FOB.

C. Place of delivery is the Buyer’s country when Goods are delivered CIF or CIP.
25.
If the force majeure event continues for too long, both parties should have
the right to ................... the contract.
(1 Point)

D. put off

A. sign

B. enforce

C. withdraw from
26.
Institute Cargo Clause C does not protect the Goods from damage
caused by .......................
(1 Point)

D. loss of cargo at port of distress

C. entry of sea lake or river water into vessel craft

A. collision of the vessel with other objects

B. fire or explosion
27.
What aspects of the goods does the carrier (the transportation
company) inspect?
(1 Point)

A. the contents of the goods

D. the packaging and the appearance of the goods

C. the Commercial Invoice

B. the Bill of Lading


28.
What might make a Bill of Lading unclean?
(1 Point)

Inadequate packaging

Second-hand packaging material

Goods are not packed in boxes

Packaging mended
29.
Fill in the blank with a suitable missing word or phrase:

The bank that informs a party of the opening of the L/C is called
issuing bank.
(1 Point)
30.
Fill in the blank with a suitable missing word or phrase:

Export credit insurance is at the ....expense.......... of the Seller. In


other words, the Seller bears the cost of export credit insurance.
(1 Point)
31.
Fill in the blank with a suitable missing word or phrase.
………………….. is the principle of LC that aims to protect the right of
the Seller.
(1 Point)
32.
How many terms are included in the Incoterms 2020? Write the
number only. 11
(1 Point)
33.
On delivery, the B/L is given the most important of all shipping
documents, which is bill of lading.
(1 Point)
34.
When the Bill of Lading is ............................., it has comments on the
damage of the Goods.
(1 Point)

A. claused

B. torn

C. clean

D. marked
35.
By …presenting………………… the certificate of insurance, the seller can
transfer the full rights to the buyer.
(1 Point)
36.
Which of the following insurance clauses offers the most restricted
coverage?
(1 Point)

A. Institute Cargo Clause A

B. Institute Cargo Clause B


C. Institute Cargo Clause C

D. Institute Cargo Clause D


37.
Fill in the blank with a suitable missing word or phrase.

In insurance policy, the exporter does not state the value of the
Goods, which is only declared after the loss has occurred.
(1 Point)
38.
In the event that payment of any payable sum is delayed, the Seller shall be
allowed to charge interests on the outstanding amount.
(1 Point)
39.
The seller is the beneficiary in the guarantee triangle.
(1 Point)
40.
Which of the following is the value of Performance Guarantee?
(1 Point)

100% of the contract price

5%- 10% of the contract price

50% of the contract price

1.5%- 5% of the contract price


41.
Fill in the blank with a suitable word or phrase.

........payment.............. guarantee allows the beneficiary to receive the


compensation from a guarantor without question.
(1 Point)
42.
In conditional guarantee, which of the following is NOT submitted by
the beneficiary to the guarantor?
(1 Point)

A decision given by the court

An arbitral award

A customs clearance form

A written approval by the principal


43.
Fill in the blank with a suitable word or phrase.

......................... is a principle that protects the right of the Buyer in a


transaction using L/C.
(1 Point)
44.
...........Issuing...................... bank is likely to be the bank working on
behalf the Buyer in the transaction using L/C.
(1 Point)
45.
Fill in the blank with a suitable word or phrase:

An/ A .......revocable........................ letter of credit can be canceled at


any time by the issuing bank or the buyer.
(1 Point)
46.
Fill in the blank with a suitable word or phrase:

When the issuing bank refuses to pay, there might be some


discrepancies in the documents submitted by the Exporter and the
terms of the L/C.
(1 Point)
47.
Fill in the blank with a suitable word or phrase:
With a confirmed L/C, the bank that checks the validity of L/C will
make the payment to the Exporter if the issuing bank fails to do so.
(1 Point)
48.
Which of the following is NOT likely to be submitted by the Seller to
the issuing bank to get the payment for the Good by L/C?
(1 Point)

Commercial invoice

The sales contract

Phytosanitary certificate

Certificate of origin
49.
Fill in the blank with a suitable word or phrase:

Bank guarantee is always to the .....account........................ of the


Buyer. In other words, the Buyer pays for bank guarantee.
(1 Point)
50.
Fill in the blank with a suitable word or phrasekho:

Open cover is slightly more convenient than floating policy because it


does not ...time-consuming ..........................
(1 Point)
51.
Translate the following passage into Vietnamese
(dịch hộ t mỗi Việt anh thôi Anh việt ko cần nhé ) If the Buyer fails to
pay the issued invoice or part thereof within the maturity period, the Seller
is entitled to suspend any other deliveries to the Buyer. The Buyer is
obliged to pay the purchase price for ordered goods duly and timely by the
due date. If the Buyer fails to fulfill this obligation, the parties agree on a
contractual penalty of 0.5% of the total purchase price for ordered goods for
each day of delay in payment until the payment has been made. The Buyer
is obliged to pay the contractual penalty to the Seller within 3 business days
after the written request for payment of the contractual penalty is delivered.
The payment of the contractual penalty does not exclude or restrict the
Seller’s right to full compensation, does not reduce the amount of the claim
for compensation, and does not remove the contractual or statutory
obligations of the Buyer.
(15 Points)
52.
Translate the following passage into Vietnamese.
BG will endeavor to adhere to the delivery dates it provided and/or
promised. If this is impossible, the Partner shall have the right to rescind the
contract after setting a reasonable grace period. The Partner shall be
deemed to have waived any claim for damages for a delayed delivery. In
the case of delay of acceptance by the Partner BG shall have the right to
store the goods at the Partner’s risk and expense, invoice the goods and
make them payable as per agreement or rescind the contract and sell the
goods to someone else. In the case of strikes or lockouts in the BG
Company or in an operation working for BG, of energy shortage, traffic
disruption, regulatory orders and delayed supply to BG, BG shall not be
bound to deliver at the time agreed upon, provided that these
circumstances were unforeseen or unpreventable by BG.
(15 Points)
53.
Translate the following passage into English.
Trong vòng 30 ngày kể từ khi ký hợp đồng, người mua phải mở một
thư tín dụng không hủy ngang cho người Bán trị giá $150,000 để thanh
toán tiền hàng như quy định trong điều khoản thanh toán. Thư tín dụng
có hình thức như quy định trong phụ lục 5 của hợp đồng. Thư tín dụng
được phát hành bởi ngân hàng mà người bán chấp nhận và được xác
nhận bởi một chi nhánh của ngân hàng tại Mỹ mà người bán chấp nhận.
Thư tín dụng được chuyển nhượng tự do và phải thanh toán tại Mỹ.
The Buyer shall, within 30 days upon execution of the Contract, open
an irrevocable Letter of credit in the amount of $150,000 in the Seller's
favor to pay for the Goods as specified in the payment term. The L/C
shall be in a form under Appendix 5 of the Contract. The L/C shall be
issued by the bank and is confirmed by a branch of an America bank
approved by the Seller. The L/C is transferable and payable in USA

You might also like