List of HVDC projects
Electric power transmission through interconnectors using high-voltage direct-current (HVDC) involves usually two converter stations and a transmission line. Generally overhead lines are used, but an important class of HVDC projects use submarine power cables. A back-to-back station has no transmission line and joins two separate AC grids at a single point. Historical HVDC systems used the Thury system of motor-generators but these have all been made obsolete by later developments such as mercury-arc valves (now also obsolete), thyristors, and IGBT power transistors.
Legend
[edit]Converter technology:
- Thury = Series-connected generators as designed by René Thury
- Merc = Mercury-arc valve rectifier and inverter
- Thyr = Thyristor rectifier and inverter
- IGBT = Insulated gate bipolar transistor
Line status:
Africa
[edit]Name |
Converter station 1 |
Converter station 2 |
Total Length (Cable/Pole) (km) |
Nominal Voltage (kV) |
Power (MW) |
Year |
Type |
Remarks |
Ref |
---|---|---|---|---|---|---|---|---|---|
Cahora Bassa | Mozambique - Songo 15°36′41″S 32°44′59″E / 15.61139°S 32.74972°E |
South Africa - Apollo 25°55′11″S 28°16′34″E / 25.91972°S 28.27611°E |
1420 (0/1420) |
533 | 1920 | 1979 | Thyr | First HVDC with Project up to 500kV Siemens and ABB refurb 2013-2014 |
[1][2][3] |
Inga-Shaba | Democratic Republic of the Congo - Kolwezi 10°39′27″S 25°27′08″E / 10.65750°S 25.45222°E |
Democratic Republic of the Congo - Inga 05°31′27″S 13°36′39″E / 5.52417°S 13.61083°E |
1700 (0/1700) |
500 | 560 | 1982 | Thyr | Upgraded in 2014 Supplier: ABB, General Electric |
[1][4][5][6] |
Caprivi Link | Namibia - Gerus 20°18′53″S 16°27′9″E / 20.31472°S 16.45250°E |
Namibia - Zambezi 17°30′6″S 24°13′20″E / 17.50167°S 24.22222°E |
950 (0/950) |
350 | 300 | 2010 | IGBT | Supplier: ABB | [1][7] |
Ethiopia–Kenya HVDC Interconnector | Ethiopia - Wolayta 6°54′27″N 37°43′19″E / 6.90750°N 37.72194°E |
Kenya - Suswa 1°03′44″S 36°21′35″E / 1.06222°S 36.35972°E |
1045 (0/1045) |
500 | 2000 | On going (2022) | Thyr | Supplier: Siemens | |
Xlinks Morocco-UK Power Project | Morocco - Guelmim-Oued Noun region | UK - Alverdiscott, Devon | 3800 | 3600 | Proposed (2022) | Supplier: Xlinks | [8] |
Australia and Oceania
[edit]Name |
Converter station 1 |
Converter station 2 |
Total Length (Cable/Pole) (km) |
Nominal Voltage (kV) |
Power (MW) |
Year |
Type |
Remarks |
Ref |
---|---|---|---|---|---|---|---|---|---|
HVDC Inter-Island 1 | New Zealand - Benmore 44°33′55″S 170°11′24″E / 44.56528°S 170.19000°E |
New Zealand - Haywards 41°9′1″S 174°58′52″E / 41.15028°S 174.98111°E |
611 (40/571) |
270 | 600 | 1965 | Merc | Built as 250 kV 600 MW link Paralleled to operate at 270 kV as positive pole with HVDC Inter-Island 2 in 1992. Partially decommissioned in 2007, fully decommissioned in August 2012. Supplier: ABB |
[1] |
HVDC Inter-Island 2 | New Zealand - Benmore 44°33′55″S 170°11′24″E / 44.56528°S 170.19000°E |
New Zealand - Haywards 41°9′1″S 174°58′52″E / 41.15028°S 174.98111°E |
611 (40/571) |
350 | 700 | 1992 | Thyr | Negative pole, operates in bipole configuration with HVDC Inter-Island 3 (previously HVDC Inter-Island 1) Restricted to 500 MW due to cable rating. Supplier: ABB |
[1] |
Terranora interconnector (Directlink) | Australia - Mullumbimby 28°34′15″S 153°27′8″E / 28.57083°S 153.45222°E |
Australia - Bungalora 28°15′20″S 153°28′20″E / 28.25556°S 153.47222°E |
59 (59/0) |
80 | 180 | 2000 | IGBT | Land cable Supplier: ABB |
[1] |
Murraylink | Australia - Red Cliffs 34°17′31″S 142°14′19″E / 34.29194°S 142.23861°E |
Australia - Berri 34°14′17″S 140°36′01″E / 34.23806°S 140.60028°E |
176 (176/0) |
150 | 200 | 2002 | IGBT | Underground XLPE cable Supplier: ABB |
[1] |
Basslink | Australia - Loy Yang 38°15′45″S 146°36′29″E / 38.26250°S 146.60806°E |
Australia - George Town 41°6′53″S 146°53′31″E / 41.11472°S 146.89194°E |
370 (298/72) | 400 | 500 | 2006 | Thyr | One of the longest HVDC cable in operation Supplier: Siemens |
[1][10][11] |
HVDC Inter-Island 3 | New Zealand - Benmore 44°33′55″S 170°11′24″E / 44.56528°S 170.19000°E |
New Zealand - Haywards 41°9′1″S 174°58′52″E / 41.15028°S 174.98111°E |
611 (40/571) |
350 | 735 | 2013 | Thyr | Positive pole, operates in bipole configuration with HVDC Inter-Island 2 Supplier: Siemens |
[12] |
Australia–ASEAN Power Link | Australia - Darwin | Singapore | 4200 undersea 800 overland |
2027 | aka Sun Cable | ||||
Marinus link | Australia - Burnie | Australia - Latrobe Valley | Approximately 340 (90/250) | 750 + 750 | late 2020s | [13] |
Asia
[edit]Name | Converter station 1 |
Converter station 2 |
Total Length (Cable/Pole) (km) |
Nominal Voltage (kV) |
Power (MW) |
Year |
Type |
Remarks |
Ref |
---|---|---|---|---|---|---|---|---|---|
Hokkaido - Honshu | Japan - Hakodate 41°55′55″N 140°39′47″E / 41.93194°N 140.66306°E |
Japan - Kamikita 40°48′06″N 141°11′52″E / 40.80167°N 141.19778°E |
193 (44/149) |
250 | 300 | 1979 | Thyr | Supplier: ABB, Hitachi, Toshiba | [1] |
Zhou Shan | China - Ningbo 29°55′25″N 121°46′51″E / 29.92361°N 121.78083°E |
China - Gao Tongge 30°02′13″N 122°04′03″E / 30.03694°N 122.06750°E |
54 (12/42) |
100 | 50 | 1982 | Thyr | [1] | |
Gezhouba - Shanghai | China - Gezhouba Dam 30°43′44″N 111°14′39″E / 30.72889°N 111.24417°E |
China - Nan Qiao 30°57′22″N 121°24′48″E / 30.95611°N 121.41333°E |
1046 (0/1046) |
500 | 1200 | 1989 | Thyr | Power line shares pylons of HVDC Hubei - Shanghai in most part of its track
HVDC C&P System Refurbished by NR Electric |
[14] |
Sileru-Barsoor | India - Sileru 17°52′01″N 81°39′21″E / 17.86694°N 81.65583°E |
India - Barsoor 19°8′20″N 81°23′47″E / 19.13889°N 81.39639°E |
196 (0/196) |
200 | 100 | 1989 | Thyr | Supplier: BHEL | [1] |
Ekibastuz–Tambov | Kazakhstan - Ekibastuz 51°48′57″N 75°18′58″E / 51.81583°N 75.31611°E |
Russia - Tambov 52°46′25″N 41°19′17″E / 52.77361°N 41.32139°E |
2414 (0/2414) |
750 | 6000 | - | Thyr | Construction sites abandoned around 1990 owing to collapse of Soviet Union, line was never completed | |
Rihand-Delhi | India - Rihand 24°01′13″N 82°47′21″E / 24.02028°N 82.78917°E |
India - Dadri 28°35′36″N 77°36′16″E / 28.59333°N 77.60444°E |
814 (0/814) |
500 | 1500 | 1990 | Thyr | Supplier: ABB, BHEL | [15] |
Haenam-Cheju | South Korea - Haenam 34°22′03″N 126°35′34″E / 34.36750°N 126.59278°E |
South Korea - Jeju 33°32′06″N 126°35′44″E / 33.53500°N 126.59556°E |
101 (101/0) |
180 | 300 | 1996 | Thyr | Supplier: Alstom | [1] |
Leyte - Luzon | Philippines - Ormoc, Leyte 11°5′19″N 124°38′21″E / 11.08861°N 124.63917°E |
Philippines - Naga, Camarines Sur 13°36′40″N 123°14′19″E / 13.61111°N 123.23861°E |
451 (21/430) |
350 | 440 | 1998 | Thyr | Supplier: ABB, Marubeni
HVDC C&P System Refurbished by NR Electric |
[1] |
Chandrapur-Padghe | India - Chandrapur 20°0′36″N 79°17′06″E / 20.01000°N 79.28500°E |
India - Padghe 19°21′26″N 73°11′18″E / 19.35722°N 73.18833°E |
752 (0/752) |
500 | 1500 | 1999 | Thyr | Supplier: ABB | [16] |
Kii Channel | Japan - Anan 33°49′40″N 134°38′14″E / 33.82778°N 134.63722°E |
Japan - Kihoku 34°12′50″N 135°30′07″E / 34.21389°N 135.50194°E |
100 (50/50) |
250 | 1400 | 2000 | Thyr | Supplier: Hitachi, Toshiba, Mitsubishi | [1] |
Tian-Guang | China - Tianshengqiao 24°54′56″N 105°05′47″E / 24.91556°N 105.09639°E |
China - Beijiao 23°18′58″N 113°15′05″E / 23.31611°N 113.25139°E |
960 (0/960) |
500 | 1800 | 2001 | Thyr | Supplier: Siemens
HVDC C&P System Refurbished by NR Electric |
[1] |
Thailand-Malaysia | Thailand - Khlong Ngae 6°42′56″N 100°27′8″E / 6.71556°N 100.45222°E |
Malaysia - Gurun 5°48′45″N 100°32′6″E / 5.81250°N 100.53500°E |
110 (0/110) |
300 | 300 | 2001 | Thyr | Supplier: Siemens | [1] |
Shengsi | China - Shengsi 30°42′06″N 122°26′22″E / 30.70167°N 122.43944°E |
China - Anabasis Sizu 30°51′56″N 121°50′25″E / 30.86556°N 121.84028°E |
66.2 (63.21/2.99) |
50 | 60 | 2002 | Thyr | [17] | |
Talcher-Kolar | India - Talcher, Odisha 21°06′01″N 85°03′49″E / 21.10028°N 85.06361°E |
India - Kolar, Karnataka 13°10′39″N 78°7′0″E / 13.17750°N 78.11667°E |
1450 (0/1450) |
500 | 2500 | 2003 | Thyr | Supplier: Siemens | [1] |
Three Gorges - Changzhou | China - Longquan 30°47′6″N 111°31′48″E / 30.78500°N 111.53000°E |
China - Zhengping 31°36′42″N 119°59′27″E / 31.61167°N 119.99083°E |
890 (0/890) |
500 | 3000 | 2003 | Thyr | From north bank of Three Gorges to Zhengping, 200 km from Shanghai in the East grid Supplier: ABB, Siemens. Sharing of grounding electrode at Chujiahu with HVDC Hubei-Shanghai |
[1][18][19] |
Guizhou - Guangdong I | China - Anshun, Guizhou 26°16′23″N 105°48′21″E / 26.27306°N 105.80583°E |
China - Zhaoqing, Guangdong 22°54′57″N 112°29′11″E / 22.91583°N 112.48639°E |
980 (0/980) |
500 | 3000 | 2004 | Thyr | Supplier: Siemens | [1] |
Three Gorges - Guangdong | China - Jingzhou 30°27′26″N 112°08′18″E / 30.45722°N 112.13833°E |
China - Huizhou 23°16′15″N 114°12′5″E / 23.27083°N 114.20139°E |
940 (0/940) |
500 | 3000 | 2004 | Thyr | Supplier: ABB | [1][20] |
Three Gorges - Shanghai | China - Yidu 30°31′45″N 111°22′35″E / 30.52917°N 111.37639°E |
China - Shanghai 31°14′13″N 121°11′13″E / 31.23694°N 121.18694°E |
1060 (0/1060) |
500 | 3000 | 2006 | Thyr | Supplier: ABB | [1][21] |
Guizhou - Guangdong II | China - Xingren 25°27′56″N 105°15′14″E / 25.46556°N 105.25389°E |
China - Shenzhen 22°45′1″N 113°59′28″E / 22.75028°N 113.99111°E |
1200 (0/1200) |
500 | 3000 | 2007 | Thyr | Supplier: Siemens, Sharing of grounding electrode at Linwu with HVDC Yunnan - Guangdong | [1] |
Ballia - Bhiwadi | India - Ballia 26°04′16″N 83°42′48″E / 26.07111°N 83.71333°E |
India - Bhiwadi 28°11′0″N 76°48′58″E / 28.18333°N 76.81611°E |
800 (0/800) |
500 | 2500 | 2010 | Thyr | Supplier: Siemens | [1] |
Baoji - Deyang | China - Baoji 34°34′47″N 107°19′49″E / 34.57972°N 107.33028°E |
China - Denyang 31°19′22″N 104°34′51″E / 31.32278°N 104.58083°E |
574 (0/574) |
500 | 3000 | 2010 | Thyr | ??? | |
Hulunbeir - Liaoning | China - Hulunbeir 48°31′04″N 119°43′30″E / 48.51778°N 119.72500°E |
China - Shenyang 41°07′25″N 122°46′44″E / 41.12361°N 122.77889°E |
920 (0/920) |
500 | 3000 | 2010 | Thyr | Supplier: ABB | [1][22] |
Xiangjiaba-Shanghai | China - Fulong 28°32′47″N 104°25′04″E / 28.54639°N 104.41778°E |
China - Fengxia 30°55′32″N 121°46′16″E / 30.92556°N 121.77111°E |
1980 (0/1980) |
800 | 6400 | 2010 | Thyr | Supplier: ABB | [1][23] |
Yunnan - Guangdong | China - Yunnan province 25°11′24″N 102°11′30″E / 25.19000°N 102.19167°E |
China - Zengcheng 23°15′19″N 113°40′44″E / 23.25528°N 113.67889°E |
1418 (0/1418) |
800 | 5000 | 2010 | Thyr | Supplier: Siemens, Sharing of grounding electrode at Linwu with HVDC Guizhou - Guangdong II
highlight: worldwide first dc 800kv hvdc application |
[1] |
Hubei - Shanghai | China - Jingmen 30°49′21″N 112°07′15″E / 30.82250°N 112.12083°E |
China - Fenjing 30°52′00″N 121°00′58″E / 30.86667°N 121.01611°E |
970 (0/970) |
500 | 3000 | 2011 | Thyr | Power line shares pylons of HVDC Gezhouba - Shanghai in most part of its track, sharing of grounding electrode at Chujiahu with HVDC Shanghai-Changzhou | ??? |
Nanhui Wind Farm Integration | China | China | 8.4 (8.4/0) |
30 | 18 | 2011 | IGBT | Supplier: C-EPRI Electric Power Engineering Co., Ltd | [24] |
Ningdong - Shandong | China - Yinchuan 38°06′56″N 106°30′55″E / 38.11556°N 106.51528°E |
China - Qingdao 36°18′41″N 119°52′53″E / 36.31139°N 119.88139°E |
1335 (0/1335) |
660 | 4000 | 2011 | Thyr | Supplier:Alstom; C-EPRI Electric Power Engineering Co., Ltd | [1] |
Qinghai - Tibet | China - Geermu 36°21′20″N 95°11′05″E / 36.35556°N 95.18472°E |
China - Lhasa 29°52′39″N 91°11′44″E / 29.87750°N 91.19556°E |
1038 (0/1038) |
400 | 1500 | 2011 | Thyr | Powerline reaches altitudes up to 5300 m above sea level Supplier: CET, SGCC |
[1] |
Mundra - Haryana | India - Mundra 22°49′46″N 69°33′22″E / 22.82944°N 69.55611°E |
India - Mohindergarh 28°21′40″N 76°12′56″E / 28.36111°N 76.21556°E | 960 (0/960) |
500 | 2500 | 2012 | Thyr | Supplier: Siemens | [1] |
Dalian City Infeed | China - Dalian North | China - Dalian South | 43 (43/0) |
320 | 1000 | 2013 | IGBT | [25] | |
Jinping - Sunan | China - Jinping 27°50′11″N 102°08′30″E / 27.83639°N 102.14167°E |
China - Suzhou 31°03′44″N 120°37′20″E / 31.06222°N 120.62222°E |
2090 (0/2090) |
800 | 7200 | 2013 | Thyr | Supplier: ABB, C-EPRI Electric Power Engineering Co., Ltd
ACC Provided by NR Electric in Jinping Converter Station |
[26] |
Nanao Multi-terminal VSC HVDC | China - Sucheng 23°26′40″N 116°48′50″E / 23.44444°N 116.81389°E |
China - Jinniu 23°26′14″N 117°01′36″E / 23.43722°N 117.02667°E; China - Qingao 23°25′46″N 117°07′45″E / 23.42944°N 117.12917°E |
32 (10/32) |
±160 | 200/100/50 | 2013 | IEGT/IGBT | SEPRI (Electric Power Research Institute, China Southern Power Grid) is technically responsible for the entire project. Multiple suppliers are involved: three different VSC HVDC valve suppliers, two different HVDC land/sea cable suppliers and three different control & protection system/equipment suppliers. | [27][28] |
Nuozhadu - Guangdong | China - Nuozhadu 22°39′20″N 100°40′00″E / 22.65556°N 100.66667°E |
China - Jiangmen 22°42′33″N 112°52′12″E / 22.70917°N 112.87000°E |
1413 | 800 | 6400 | 2013 | Thyr | ??? | |
Xiluodo - Guangdong | China - Zhaotong 28°07′21″N 104°22′27″E / 28.12250°N 104.37417°E |
China - Conghua 23°34′00″N 113°27′03″E / 23.56667°N 113.45083°E |
1286 (0/1286) |
500 | 6400 | 2013 | Thyr | ??? | |
Hami - Zhengzhou | China-Hami 42°35′20″N 93°27′46″E / 42.58889°N 93.46278°E |
China-Zhengzhou 34°48′46″N 114°03′24″E / 34.81278°N 114.05667°E |
2210 | 800 | 8000 | 2014 | Thyr | Supplier: C-EPRI Electric Power Engineering Co., Ltd
HVDC C&P System Provided by NR Electric |
[29][30][31][32][33][34] |
Jindo - Jeju | South Korea - Jindo 34°23′08″N 126°11′14″E / 34.38556°N 126.18722°E |
South Korea - Jeju 33°27′17″N 126°28′25″E / 33.45472°N 126.47361°E |
105 (105/0) |
250 | 400 | 2014 | Thyr | Supplier: Alstom (converter stations), LS Cable and System (cables). | [1][35][36] |
Xiluodo - West Zhejiang | China - Xiluodu 28°27′37″N 104°20′20″E / 28.46028°N 104.33889°E |
China - Jinghua 28°53′46″N 119°43′00″E / 28.89611°N 119.71667°E |
1680 | 800 | 8000 | 2014 | Thyr | Supplier:C-EPRI Electric Power Engineering Co., Ltd | ??? |
Zhoushan Multi-terminal DC Interconnection | China - Zhoushan 30°09′07″N 121°59′29″E / 30.15194°N 121.99139°E |
China - Qushan 30°25′26″N 122°16′48″E / 30.42389°N 122.28000°E ; China - Daishan 30°19′37″N 122°11′35″E / 30.32694°N 122.19306°E ; China - Yangshan 30°36′26″N 122°07′40″E / 30.60722°N 122.12778°E ; China - Sijiao 30°41′45″N 122°25′50″E / 30.69583°N 122.43056°E |
134 (134/0) |
±200 | 400 | 2014 | IGBT | Supplier:C-EPRI Electric Power Engineering Co., Ltd
HVDC C&P System Provided by NR Electric |
[37] |
Humeng - Shandong | China | China | 800 | 6400 | 2015 | Thyr | ??? | ||
Irkutsk - Beijing | Russia - Irkutsk | China - Beijing | 800 | 6400 | 2015 | Thyr | ??? | ||
Champa-Kurukshetra | India - Champa | India - Kurukshetra | 1365 (0/1365) |
800 | 2 x 3000 | 2016 | Thyr | 2 Bipoles. Supplier: Alstom | [38] |
Goupitan - Guangdong | China | China | 3000 | 2016 | Thyr | ??? | |||
Jinsha River II - East China | China | China | 800 | 6400 | 2016 | Thyr | ??? | ||
North-East | India - Agra 27°05′01″N 78°04′22″E / 27.08361°N 78.07278°E |
India - Biswanath 26°44′23″N 93°13′09″E / 26.73972°N 93.21917°E |
1728 (0/1728) |
800 | 6000 | 2016 | Thyr | Will supply electricity to serve 90 million people Bipole Ultra high voltage, multiterminal (intermediate converter station at Alipurdauar 26°29′23″N 89°27′41″E / 26.48972°N 89.46139°E) Supplier: ABB |
[39] |
New HVDC Hokkaido-Honshu | Japan - Imabetsu 41°08′01″N 140°30′46″E / 41.13361°N 140.51278°E |
Japan - Hokuto 41°54′57″N 140°35′07″E / 41.91583°N 140.58528°E |
122 (24/98) |
250 | 300 | 2019 | IGBT | suppliers: Toshiba | [40][41] |
Matiari to Lahore Transmission Line Project | Pakistan - Matiari, Sindh | Pakistan - Lahore, Punjab | 878 | 660 | 4000 | 2021 | Thyr | ±660 kV Bipole HVDC with Converter/ Grounding Electrode Stations | [42] |
Inner Mongolia - Linyi | China - Shizhustan 38°46′40″N 106°52′00″E / 38.77778°N 106.86667°E |
China - Linyi 35°33′07″N 118°37′07″E / 35.55194°N 118.61861°E |
800 | 6400 | 2017 | Thyr | ??? | ||
Jiuquan- Xiangtan | China - Qiaowan 40°36′03″N 96°43′22″E / 40.60083°N 96.72278°E |
China - Xiangtan 27°38′55″N 112°47′25″E / 27.64861°N 112.79028°E |
800 | 6400 | 2017 | Thyr | Supplier:C-EPRI Electric Power Engineering Co., Ltd
HVDC C&P System Provided by NR Electric |
??? | |
North Shanxi - Nanjing | China - North Shanxi 39°39′35″N 112°27′45″E / 39.65972°N 112.46250°E |
China - Nanjing 32°54′47″N 118°35′33″E / 32.91306°N 118.59250°E |
2017 | Thyr | ??? | ||||
Northwest Yunnan - Guangdong | China - Xinsong 26°24′55″N 99°49′12″E / 26.41528°N 99.82000°E |
China - Dongfang 22°44′17″N 113°52′07″E / 22.73806°N 113.86861°E |
1953 | 800 | 5000 | 2018 | Thyr | ??? | |
Xilin Hot - Taizhou | China - Xilin Hot 44°14′40″N 116°30′22″E / 44.24444°N 116.50611°E |
China - Taizhou 33°07′25″N 119°58′05″E / 33.12361°N 119.96806°E |
800 | 10000 | 2017 | Thyr | ??? | ||
Yinchuan - Zhuji | China - Yinchuan 37°43′45″N 106°32′22″E / 37.72917°N 106.53944°E |
China - Zhuji 29°56′25″N 120°13′12″E / 29.94028°N 120.22000°E |
800 | 6400 | 2017 | Thyr | HVDC C&P System Provided by NR Electric | ??? | |
Dianxibei - Guangdong | China-Lijiang | China-Zhengzhen | 1928/0 | 800 | 5000 | 2017 | Thyr | Supplier: C-EPRI Electric Power Engineering Co., Ltd | ??? |
Jinsha River II - Fujian | China | China | 800 | 6400 | 2018 | Thyr | ??? | ||
Humeng - Liaoning | China | China | 800 | 6400 | 2018 | Thyr | ??? | ||
Rudong Offshore Wind Connector | China - Jiangsu Rudong | China - Jiangsu Rudong Platform | 100 (100/0) |
400 | 1100 | 2022 | IGBT | Suppliers: XJ and RXHK for valve, ZTT Cable | |
Sheyang Offshore Wind Connector | China - Jiangsu Sheyang | China - Jiangsu Sheyang Platform | 83 (83/0) |
250 | 1100 | 2022 | IGBT | ||
Zhangbei DC Grid Project | China - Beijing | China - Zhangbei China - Fengning China - Kangbao |
495 (0/495) |
500 | 3000/3000/1500/1500 | 2021 | IGBT | Four terminal DC Grid
Suppliers: NR Electric, others |
[43] |
Wudongde multi-terminal UHVDC demonstration project | China - Yunnan | China - Guangxi China - Guangdong |
1489 (0/1489) |
800 | 8000/3000/5000 | 2021 | Thyr/IGBT | Three terminal Hybrid DC system, Yunnan (Thyristor), Guangdong and Guangxi (IGBT) | |
Raigarh-Pugalur | India - Raigarh 21°51′21″N 83°21′01″E / 21.85583°N 83.35028°E |
India - Pugalur 10°49′33″N 77°32′13″E / 10.82583°N 77.53694°E India - Thrissur |
1830 |
800 | 6000 | 2019 | Thyr | Supplier: ABB; One of the World's biggest Multi-terminal HVDC system with Ultra High Voltage DC Transmission system (UHVDC) | [44] |
CASA-1000 | Tajikistan - Sangtuda | Pakistan - Nowshera | 750 | 500 | 1300 | 2025 | Thyr | ±500 kV Bipole HVDC with Converter Stations | [45][46] |
India–Sri Lanka HVDC Interconnection | Madurai - India | Anurathapura - Sri Lanka | 285 | ±320 | 500/1000 | 2030 | Thyr | ||
Andaman HVDC Connection | Paradip - India | Port Blair - India | 1160 | ±320 | 250/125 | 2030 | IGBT | one of the world's longest deep-sea UG cable HVDC system | [47] |
Europe
[edit]Name |
Converter station 1 |
Converter station 2 |
Total Length (Cable/Pole) (km) |
Nominal Voltage (kV) |
Power (MW) |
Year |
Type |
Remarks |
Ref |
---|---|---|---|---|---|---|---|---|---|
Miesbach-Munich Power Transmission | Germany - Miesbach | Germany - Munich | 58 (0/58) |
2 | 0.0025 | 1882 | Single machine | Demonstration facility
Dismantled |
|
Gorzente River - Genoa DC transmission scheme | Italy - Gorzente River | Italy - Genoa | ? | 6 | ? | 1889 | Thury | Upgraded later to a voltage of 14 kV, power of 2.5 MW and a length of 120 km
Dismantled |
|
La Chaux-de-Fonds DC transmission scheme | Switzerland - ? | Switzerland - ? | ? | 14 | ? | 1897 | Thury | Dismantled | |
St. Maurice - Lausanne DC transmission scheme | Switzerland - St. Maurice | Switzerland - Lausanne | ? | 22 | 3.7 | 1899 | Thury | Dismantled | |
Lyon-Moutiers DC transmission scheme | France - Lyon | France - Moutiers | 200 (10/190) |
75 | 30 | 1906 | Thury | Dismantled in 1936 | |
Wilesden-Ironbridge DC transmission scheme | UK - Wilesden | UK - Ironbridge | ? | 100 | ? | 1910 | Thury | Dismantled | |
Chambéry DC transmission scheme | France - ? | France - ? | ? | 150 | ? | 1925 | Thury | Dismantled in 1937 | |
HVDC Zurich-Wettingen | Switzerland - Wettingen 47°27′25″N 8°19′15″E / 47.45694°N 8.32083°E | Switzerland - Zurich | 20 (0/20) |
50 | 0.5 | 1939 | Merc | Experimental facility built by BBC
Dismantled |
|
HVDC Charlottenburg-Moabit | Germany - Berlin-Moabit | Germany - Berlin-Charlottenburg | 4.6 (0/4.6) |
100 | 14 | 1942 | Merc | Experimental facility built by Siemens
Dismantled in 1945 |
|
Lehrte-Misburg HVDC | Germany - Lehrte 52°22′54″N 9°55′03″E / 52.38167°N 9.91750°E | Germany - Hannover/Misburg | ? | 80 | 16 | 1944 | Merc | Experimental facility
Dismantled |
|
Elbe-Project | Germany - Vockerode 51°50′32″N 12°21′26″E / 51.84222°N 12.35722°E | Germany - Berlin, Marienfelde 52°25′39″N 13°22′13″E / 52.42750°N 13.37028°E | 115 (115/0) |
200 | 60 | 1945 | Merc | Never placed in service
Dismantled |
|
HVDC Trollhättan-Mellerud | Sweden - Trollhättan | Sweden - Mellerud | 50 (0/50) |
45 | 6.5 | 1946 | Merc | Experimental facility built by ASEA
Dismantled |
|
Moscow–Kashira | Russia - Moscow 55°39′32″N 37°38′16″E / 55.65889°N 37.63778°E | Russia - Kashira 54°51′29″N 38°14′45″E / 54.85806°N 38.24583°E | 100 (100/0) |
200 | 30 | 1951 | Merc | Built of parts of HVDC Elbe-Project
Shut down |
[1] |
Gotland 1 | Sweden - Västervik 57°43′41″N 16°38′51″E / 57.72806°N 16.64750°E | Sweden - Yigne 57°35′13″N 18°11′44″E / 57.58694°N 18.19556°E | 98 (98/0) |
200 | 20 | 1954 | Merc | World's first commercial HVDC link. Expanded by ABB in 1970, decommissioned in 1986 | [1][48] |
Cross-Channel | France - Echingen 50°41′48″N 1°38′21″E / 50.69667°N 1.63917°E | UK - Lydd 50°54′54″N 0°56′50″E / 50.91500°N 0.94722°E | 64 (64/0) |
100 | 160 | 1961 | Merc | Shut down in 1984 | [1] |
Volgograd-Donbass | Russia - Volzhskaya 48°49′34″N 44°40′20″E / 48.82611°N 44.67222°E | Ukraine - Mikhailovskaya 48°39′13″N 38°33′56″E / 48.65361°N 38.56556°E | 475 (0/475) |
400 | 750 | 1965 | Merc/Thyr | Shut down in 2014 | [1] |
Konti-Skan 1 | Denmark - Vester Hassing 57°3′46″N 10°5′24″E / 57.06278°N 10.09000°E | Sweden - Stenkullen 57°48′15″N 12°19′13″E / 57.80417°N 12.32028°E | 176 (87/89) |
250 | 250 | 1965 | Merc | Replaced in August 2006 by modern converters using thyristors | [1] |
SACOI 1 | Italy - Suvereto 43°3′10″N 10°41′42″E / 43.05278°N 10.69500°E ( before 1992: Italy - San Dalmazio 43°15′43″N 10°55′05″E / 43.26194°N 10.91806°E) | France- Lucciana 42°31′40″N 9°26′59″E / 42.52778°N 9.44972°E ; Codrongianos, Italy 40°39′7″N 8°42′48″E / 40.65194°N 8.71333°E | 483 (365/118) |
200 | 200 | 1965 | Merc | Replaced in 1986 by Thyr, multiterminal scheme. The line reused by SACOI 2, see below. |
[1] |
Kingsnorth | UK - Kingsnorth 51°25′11″N 0°35′46″E / 51.41972°N 0.59611°E | UK - London-Beddington 51°22′23″N 0°7′38″W / 51.37306°N 0.12722°W | 85 (85/0) |
266 | 320 | 1975 | Merc | Bipolar scheme
Supplier: English Electric Shut down in 1987 |
[49] |
Kingsnorth | UK - Kingsnorth | UK - London-Willesden 51°32′03″N 0°15′29″W / 51.53417°N 0.25806°W | 111 (111/0) |
266 | 320 | 1975 | Merc | Opposite pole of Kingsnorth - Beddington. Cable wholly underground except for Thames crossing - crossed on upstream side of Putney District line railway bridge | |
Skagerrak 1 + 2 | Denmark - Tjele 56°28′44″N 9°34′1″E / 56.47889°N 9.56694°E | Norway - Kristiansand 58°15′36″N 7°53′55″E / 58.26000°N 7.89861°E | 230 (130/100) |
250 | 500 | 1977 | Thyr | Supplier: STK(Nexans) Control system upgrade by ABB in 2007 | [50][51][52] |
Gotland 2 | Sweden - Västervik 57°43′41″N 16°38′51″E / 57.72806°N 16.64750°E | Sweden - Yigne 57°35′13″N 18°11′44″E / 57.58694°N 18.19556°E | 99.5 (92.9/6.6) |
150 | 130 | 1983 | Thyr | Supplier: ABB | |
Interconnexion France Angleterre (new) | France - Les Mandarins 50°54′11″N 1°47′5″E / 50.90306°N 1.78472°E | UK - Sellindge 51°6′21″N 0°58′32″E / 51.10583°N 0.97556°E | 72 (72/0) |
270 | 2000 | 1986 | Thyr | 2 bipolar systems
Supplier: Alstom |
[1][53] |
Gotland 3 | Sweden - Västervik 57°43′41″N 16°38′51″E / 57.72806°N 16.64750°E | Sweden - Yigne 57°35′13″N 18°11′44″E / 57.58694°N 18.19556°E | 98 (98/0) |
150 | 130 | 1987 | Thyr | Supplier: ABB | |
Konti-Skan 2 | Denmark - Vester, Hassing 57°3′46″N 10°5′24″E / 57.06278°N 10.09000°E | Sweden - Lindome 57°36′24″N 12°6′40″E / 57.60667°N 12.11111°E | 147 (87/60) |
285 | 300 | 1988 | Thyr | Supplier: ABB | |
Fenno-Skan | Finland - Rauma 61°09′07″N 21°37′32″E / 61.15194°N 21.62556°E | Sweden - Dannebo 60°24′14″N 18°08′10″E / 60.40389°N 18.13611°E | 233 (200/33) |
400 | 500 | 1989 | Thyr | Supplier: ABB | |
SACOI 2 | Italy - Suvereto 43°3′10″N 10°41′42″E / 43.05278°N 10.69500°E ( before 1992: Italy - San Dalmazio 43°15′43″N 10°55′05″E / 43.26194°N 10.91806°E) | France- Lucciana 42°31′40″N 9°26′59″E / 42.52778°N 9.44972°E ; Codrongianos, Italy 40°39′7″N 8°42′48″E / 40.65194°N 8.71333°E | 422 (118/304) |
200 | 300 | 1992 | Thyr | Multiterminal scheme
Supplier: Alstom |
|
Skagerrak 3 | Denmark - Tjele 56°28′44″N 9°34′1″E / 56.47889°N 9.56694°E | Norway - Kristiansand 58°15′36″N 7°53′55″E / 58.26000°N 7.89861°E | 230 (130/100) |
350 | 440 | 1993 | Thyr | Supplier: Nexans ABB | [50] |
Baltic Cable | Germany - Lübeck- Herrenwyk 53°53′46″N 10°48′9″E / 53.89611°N 10.80250°E | Sweden - Kruseberg 55°30′1″N 13°8′45″E / 55.50028°N 13.14583°E | 262 (250/12) |
450 | 600 | 1994 | Thyr | Supplier: ABB | |
Kontek | Denmark - Bjæverskov 55°27′1″N 12°0′27″E / 55.45028°N 12.00750°E | Germany - Bentwisch 54°6′3″N 12°13′1″E / 54.10083°N 12.21694°E | 170 (170/0) |
400 | 600 | 1996 | Thyr | Supplier: ABB | |
Hellsjön-Grängesberg | Sweden - Hellsjön 60°02′50″N 15°08′52″E / 60.04722°N 15.14778°E | Sweden - Grängesberg 60°03′53″N 14°59′39″E / 60.06472°N 14.99417°E | 10 (0/10) |
180 | 3 | 1997 | IGBT | Experimental HVDC
Supplier: ABB |
|
Visby-Näs | Sweden - Näs 57°05′58″N 18°14′27″E / 57.09944°N 18.24083°E | Sweden - Visby 57°37′29″N 18°21′18″E / 57.62472°N 18.35500°E | 70 (70/0) |
80 | 50 | 1999 | Thyr | ||
SwePol | Poland - Wierzbięcin 54°30′8″N 16°53′28″E / 54.50222°N 16.89111°E | Sweden - Stärnö 56°9′11″N 14°50′29″E / 56.15306°N 14.84139°E | 245 (245/0) |
450 | 600 | 2000 | Thyr | Supplier: ABB | [54] |
Tjæreborg | Denmark - Tjæreborg/Enge 55°26′52″N 8°35′34″E / 55.44778°N 8.59278°E | Denmark - Tjæreborg/Substation 55°28′07″N 8°33′36″E / 55.46861°N 8.56000°E | 4.3 (4.3/0) |
9 | 7 | 2000 | IGBT | Interconnection to wind power generating stations | |
Italy-Greece | Greece - Arachthos 39°11′00″N 20°57′48″E / 39.18333°N 20.96333°E | Italy - Galatina 40°9′53″N 18°7′49″E / 40.16472°N 18.13028°E | 310 (200/110) |
400 | 500 | 2001 | Thyr | ||
Moyle | UK - Auchencrosh 55°04′10″N 4°58′50″W / 55.06944°N 4.98056°W | UK - N. Ireland- Ballycronan More 54°50′34″N 5°46′11″W / 54.84278°N 5.76972°W | 63.5 (63.5/0) |
250 | 500 | 2001 | Thyr | Supplier: Siemens, Nexans | [55] |
HVDC Troll | Norway - Kollsnes 60°33′01″N 4°50′26″E / 60.55028°N 4.84056°E | Norway - Offshore platform Troll A 60°40′00″N 3°40′00″E / 60.66667°N 3.66667°E | 70 (70/0) |
60 | 80 | 2004 | IGBT | Power supply for offshore gas compressor
Supplier: ABB |
[56] |
Estlink | Finland - Espoo 60°12′14″N 24°33′06″E / 60.20389°N 24.55167°E | Estonia - Harku 59°23′5″N 24°33′37″E / 59.38472°N 24.56028°E | 105 (105/0) |
150 | 350 | 2006 | IGBT | Supplier: ABB | [56] |
NorNed | Netherlands - Eemshaven 53°26′4″N 6°51′57″E / 53.43444°N 6.86583°E | Norway - Feda 58°16′58″N 6°51′55″E / 58.28278°N 6.86528°E | 580 (580/0) |
450 | 700 | 2008 | Thyr | Supplier: ABB, Nexans | [56] |
BritNed | UK - Grain 51°26′24″N 0°43′0″E / 51.44000°N 0.71667°E | Netherlands - Maasvlakte 51°57′27″N 4°01′17″E / 51.95750°N 4.02139°E | 245 (245/0) |
450 | 1000 | 2010 | Thyr | Operational since April 2011. Supplier: Siemens | [56][57] |
StoreBælt | Denmark - Fraugde 55°22′01″N 10°30′25″E / 55.36694°N 10.50694°E | Denmark - Herslev 55°31′53″N 11°19′01″E / 55.53139°N 11.31694°E | 56 (56/0) |
400 | 600 | 2010 | Thyr | Operational since August 2010. Supplier: Siemens | [56] |
Cometa | Spain - Morvedre 39°38′28″N 0°14′7″W / 39.64111°N 0.23528°W | Spain - Santa Ponsa 39°32′2″N 2°30′21″E / 39.53389°N 2.50583°E | 247 (247/0) |
250 | 400 | 2011 | Thyr | Expected completion 2011
Supplier: Siemens (converter stations); Prysmian/Nexans (cables) |
[56] |
Fenno-Skan 2 | Finland - Rauma 61°09′07″N 21°37′32″E / 61.15194°N 21.62556°E | Sweden - Finnböle 60°25′30″N 17°3′42″E / 60.42500°N 17.06167°E | 303 (200/103) |
500 | 800 | 2011 | Thyr | ||
SAPEI | Italy - Latina 41°25′47″N 12°48′25″E / 41.42972°N 12.80694°E | Italy - Fiume Santo 40°50′29″N 8°18′21″E / 40.84139°N 8.30583°E | 435 (435/0) |
500 | 1000 | 2011 | Thyr | The largest HVDC link in the Mediterranean Sea. Supplier: ABB | [56][60][61] |
Valhall HVDC | Norway - Lista 58°04′37″N 6°46′29″E / 58.07694°N 6.77472°E | Norway - Valhall, Offshore platform | 292 (292/0) |
150 | 78 | 2011 | IGBT | Supplier: ABB, Nexans | [62] |
BorWin1 | Germany - Diele | Germany - BorWin Alpha platform | 200 (200/0) |
±150 | 400 | 2012 | IGBT | Supplier: ABB | [63][64][65] |
East West Interconnector | Ireland - Woodland 53°28′16″N 6°34′3″W / 53.47111°N 6.56750°W | UK - Shotton, Wales 53°13′38″N 3°4′22″W / 53.22722°N 3.07278°W | 130 (130/0) |
±200 | 500 | 2012 | IGBT | Supplier: ABB | [66] |
Fenno-Skan 1 Upgrade | Finland - Rauma | Sweden - Finnböle | 233 (200/33) |
400 | 500 | 2013 | Thyr | Upgrade
Supplier:ABB |
[67][68][69] |
Estlink 2 | Finland - Anttila 60°22′36″N 25°22′01″E / 60.37667°N 25.36694°E | Estonia - Püssi 59°22′13″N 27°04′05″E / 59.37028°N 27.06806°E | 171 (157/14) |
450 | 650 | 2014 | Thyr | Supplier: Siemens, Nexans | |
ÅL-link | Finland - Naantali (sv:Nådendal) 60°27′49″N 22°03′49″E / 60.46361°N 22.06361°E | Åland - Ytterby | 158 (158/0) |
80 | 100 | 2015 | IGBT | Supplier: ABB | [70][71][72] |
BorWin2 | Germany - Diele 53°7′30″N 7°18′29″E / 53.12500°N 7.30806°E | Germany - BorWin Beta platform 54°21′18″N 6°01′30″E / 54.35500°N 6.02500°E | 200 (200/0) |
±300 | 800 | 2015 | IGBT | Supplier: Siemens | [73] |
DolWin1 | Germany - Heede 52°58′57″N 7°15′26″E / 52.98250°N 7.25722°E | Germany - DolWin Alpha platform 53°59′42″N 6°25′16″E / 53.99500°N 6.42111°E | 165 (165/0) |
±320 | 800 | 2015 | IGBT | Supplier:ABB | [74] |
HelWin1 | Germany - Büttel 53°55′01″N 9°13′55″E / 53.91694°N 9.23194°E | Germany - HelWin Alpha platform 54°27′07″N 7°44′20″E / 54.45194°N 7.73889°E | 130 (130/0) |
±250 | 576 | 2015 | IGBT | Supplier: Siemens | [75] |
HelWin2 | Germany - Büttel 53°55′01″N 9°13′55″E / 53.91694°N 9.23194°E | Germany - HelWin Beta platform 54°27′11″N 7°44′20″E / 54.45306°N 7.73889°E | 130 (130/0) |
±320 | 690 | 2015 | IGBT | Supplier: Siemens | |
INELFE | France - Baixas 42°43′56″N 2°48′14″E / 42.73222°N 2.80389°E | Spain - Santa Llogaia 42°13′59″N 2°56′39″E / 42.23306°N 2.94417°E | 64 (64/0) |
±320 | 2000 | 2015 | IGBT | Supplier: Siemens, Cables: Prysmian. €700m, 8 km tunnel near HSR | [76] |
LitPol Link HVDC is B2B | Lithuania - Alytus | Poland - Elk | 160 (0/160) |
70 | 500 | 20152[80] | Thyr | Supplier: ABB | [81][82][83] |
NordBalt | Sweden - Nybro 56°46′4″N 15°51′15″E / 56.76778°N 15.85417°E | Lithuania - Klaipėda 55°40′54″N 21°15′24″E / 55.68167°N 21.25667°E | 450 (450/0) |
300 | 700 | 2015 | IGBT | Supplier: ABB | [84] |
Skagerrak 4 | Denmark - Tjele 56°28′44″N 9°34′1″E / 56.47889°N 9.56694°E | Norway - Kristiansand 58°15′36″N 7°53′55″E / 58.26000°N 7.89861°E | 244 (244/0) |
500 | 700 | 2015 | IGBT | Suppliers: Nexans, ABB | [85] |
SylWin1 | Germany - Büttel 53°55′01″N 9°13′55″E / 53.91694°N 9.23194°E | Germany - SylWin Alpha platform 55°03′47″N 7°14′28″E / 55.06306°N 7.24111°E | 205 (205/0) |
±320 | 864 | 2015 | IGBT | Supplier: Siemens | [86] |
Troll A 3&4 | Norway - Kollsnes | Norway - Troll A 3&4 platform | 70 (70/0) |
66 | 100 | 2015 | IGBT | Supplier: ABB | [87][88][89][90][91][92] |
DolWin2 | Germany - Heede 52°58′52″N 7°15′26″E / 52.98111°N 7.25722°E | Germany - DolWin Beta platform 53°58′41″N 6°55′23″E / 53.97806°N 6.92306°E | 135 (135/0) |
±320 | 900 | 2016 | IGBT | Supplier: ABB | [93] |
DolWin3 | Germany - Heede 52°58′57″N 7°15′26″E / 52.98250°N 7.25722°E | Germany - DolWin Gamma platform 53°59′42″N 6°25′16″E / 53.99500°N 6.42111°E | 160 (160/0) |
±320 | 900 | 2017 | IGBT | Supplier: Alstom | [94] |
HVDC MON.ITA Project | Italy-Cepagatti 42°23′41″N 14°07′30″E / 42.39472°N 14.12500°E | Montenegro - Lastva Grbaljska 42°19′03″N 18°47′41″E / 42.31750°N 18.79472°E | 415 (415/0) |
±500 | 1000 | 2019 | Thyr | Supplier: Toshiba (converter stations); Nexans (cables). | [95][96][97] |
Western HVDC Link | UK - Hunterston 55°43′16″N 4°53′7″W / 55.72111°N 4.88528°W | UK - Flintshire Bridge 53°13′54″N 3°1′58″W / 53.23167°N 3.03278°W | 422 (422/0) |
600 | 2200 | 2017-18 | Thyr | Supplier: Prysmian Group, Siemens First subsea 600kV link |
[98][99] |
Caithness - Moray Link3 | UK - Spittal 58°28′47″N 3°27′08″W / 58.47972°N 3.45222°W | UK - Blackhillock 57°31′24″N 2°56′55″W / 57.52333°N 2.94861°W | 160 | 320 | 1200 | 2018 | IGBT | Supplier: ABB | [100][101] |
BorWin3 | Germany - Diele | Germany - BorWin Gamma platform | 200 (200/0) |
±320 | 900 | 2019 | IGBT | Supplier: Siemens | |
COBRAcable | Denmark - Endrup via Fanø 55°31′49″N 8°42′13″E / 55.53028°N 8.70361°E | Netherlands - Eemshaven 53°26′07″N 6°52′02″E / 53.43528°N 6.86722°E | 325 | ±320 | 700 | 20194 | IGBT | Suppliers: Siemens, Prysmian, Cost € 449m | [102][103][104][105][106] |
Johan Sverdrup Phase 1 | Norway - Haugsneset | Norway - Johan Sverdrup platform | 200 (200/0) |
±80 | 100 | 2019 | IGBT | Supplier: ABB, NKT | [107] |
France-Italy via Fréjus Road Tunnel | France, Grand-Île | Italy, Piossasco | 190 | ±320 | 2x600 | 2019 | IGBT | Supplier: Alstom (converter stations); Prysmian (cables). | [108][109][110][111] |
Nemo Link | Belgium - near Bruges | UK - Richborough Energy Park | 140 (140/0) |
400 | 1000 | 2019 | IGBT | Converter stations: Siemens, cables: J-power systems[112] | [113][114] |
ALEGrO | Belgium - Visé | Germany - Oberzier | 100 (100/0) |
320 | 1000 | 20205 | IGBT | Converter stations: Siemens
Cables: General Cable |
[115][116][117] |
SydVästlänken | Sweden - Barkeryd 57°44′52″N 14°39′19″E / 57.74778°N 14.65528°E | Sweden - Hurva 55°49′59″N 13°36′08″E / 55.83306°N 13.60222°E | 260 (197/63) |
±300 | 2x720 | 2021 | IGBT | Supplier: Alstom | |
IFA-2 | France - Tourbe, Normandie | UK - Chilling, Hampshire | 204 | 320 | 1000 | 2021 | IGBT | Supplier: ABB | [120][121][122][123] |
NORD.LINK | Norway - Tonstad 58°40′07″N 6°45′16″E / 58.66861°N 6.75444°E | Germany - Wilster 53°55′18″N 9°20′41″E / 53.92167°N 9.34472°E | 623 (570/53) |
525 | 1400 | 2021 | IGBT | Supplier: ABB | [124] |
North Sea Link | Norway - Kvilldal | UK - Blyth | 730 (730/0) |
515 | 1400 | 2021 | IGBT | Supplier: ABB, Prysmian Group, Nexans, MACH 3 Control & Protection | [125][126][127][128] |
ElecLink | France - Les Mandarins | UK - Sellindge | 70 | 320 | 1000 | 2022 | IGBT | In the Channel Tunnel Cost €580m |
[129][130] |
Johan Sverdrup Phase 2 | Norway - Haugsneset | Norway - Johan Sverdrup platform | 200 (200/0) |
±80 | 200 | 2022 | IGBT | Supplier: Siemens, NKT | [107][131] |
Viking Link | Denmark - Revsing | UK - Bicker Fen | 740 | 525 | 1400 | 2023 | IGBT | Suppliers: Siemens, Prysmian and NKT | [132][133] |
DolWin6 | Germany - Emden/Ost | Germany - DolWin Zeta platform | 90 (90/0) |
±320 | 900 | 2023 | IGBT | Supplier: Siemens, Prysmian | [134][135] |
Dogger Bank A | UK - Creyke Beck 53°48′33″N 0°25′1″W / 53.80917°N 0.41694°W | UK - Dogger Bank A platform | 207 (207/0) |
320 | 1200 | 2023 | IGBT | Suppliers: ABB, Aibel and NKT, 172 km submarine cable and 35 km underground cable | [136][137][138] |
Shetland HVDC Connection | UK - Upper Kergord 60°17′35″N 1°16′15″W / 60.29306°N 1.27083°W | UK - near Staxigoe 58°27′50″N 3°4′52″W / 58.46389°N 3.08111°W [139] | 260 (260/0) |
320 | 600 | 20246 | IGBT | [140][141] | |
DolWin5 | Germany - Emden/Ost | Germany - DolWin Epsilon platform | 130 (130/0) |
±320 | 900 | 2024 | IGBT | Supplier: ABB, Aibel, Prysmian | [142] |
Ariadne Interconnection | Greece – Athens | Greece – Heraklion | 335
(335/0) |
500 | 1000 | 2024 | [143] | ||
Dogger Bank B | UK - Creyke Beck 53°48′33″N 0°25′1″W / 53.80917°N 0.41694°W | UK - Dogger Bank B platform | 207 (207/0) |
320 | 1200 | 2024 | IGBT | Suppliers: ABB, Aibel and NKT, 172 km submarine cable and 35 km underground cable | [136][137] |
Greenlink | Ireland – County Wexford | UK – Pembrokeshire, Wales | 200 | 320 | 500 | 2024 | |||
BorWin5 | Germany - Garrel/Ost | Germany - BorWin Epsilon platform | 230 | 320 | 900 | 2025 | [144] | ||
Dogger Bank C | UK - Lazenby | UK - Dogger Bank C platform | 270 | 320 | 1200 | 2026 | [145][146] | ||
Sofia | UK - Lazenby | UK - Sofia platform | 227 | 320 | 1320 | 2026 | [147][148] | ||
Celtic Interconnector | Ireland | France | 575 | 500 | 700 | 2026 | [149] | ||
East Anglia THREE | UK - Bramford | UK - East Anglia THREE platform | 190 | 320 | 1400 | 2026 | [150][151] | ||
SüdOstLink | Germany – Wolmirstedt | Germany – Landshut | 500 | 525 | 2000 | 2027 | [152] | ||
Hornsea 3 Link 1 | UK - Norwich | UK - Hornsea 3 Link 1 platform | 170 | 320 | 2027 | [153][154][155] | |||
Hornsea 3 Link 2 | UK - Norwich | UK - Hornsea 3 Link 2 platform | 170 | 320 | 2027 | [153][154][155] | |||
EuroAsia Interconnector | Israel - Hadera, via Cyprus - Kofinou | Greece - Korakia, Crete | 1208 | 500 | 2000 | 2027 | [156][157] | ||
EuroAfrica Interconnector | Egypt - Damietta - via Cyprus - Kofinou | Greece - Korakia, Crete | 1396 | 500 | 2000 | 2027 | [158][159][160][161] | ||
NeuConnect | Germany - Wilhelmshaven | UK - Isle of Grain | 725 | ±525 | 1400 | 2028 | |||
Harmony Link | Lithuania - Darbėnai | Poland - Zarnowiec | 330 | ±320 | 700 | 2028 | |||
DolWin4 | Germany - Hanekenfähr | Germany - DolWin4 platform | 215 | 320 | 900 | 2028 | [162][163] | ||
BorWin4 | Germany - Hanekenfähr | Germany - BorWin4 platform | 280 | 320 | 900 | 2029 | [162][163] | ||
IJmuiden Ver Alpha | Netherlands - Borssele | Netherlands - IJmuiden Ver Alpha platform | 176 | 525 | 2000 | 2029 | [164][165][166] | ||
IJmuiden Ver Beta | Netherlands - Maasvlakte | Netherlands - IJmuiden Ver Beta platform | 525 | 2000 | 2029 | [167][168] | |||
IJmuiden Ver Gamma | Netherlands - Maasvlakte | Netherlands - IJmuiden Ver Gamma platform | 525 | 2000 | 2029 | [169][168] | |||
Eastern HVDC Link | UK - Peterhead | UK - Hawthorn | 305 | 400 | 2000 | 2029 | [170] | ||
Western Isles HVDC connection | UK - Arnish Point near Stornoway | UK - Beauly | 156 | 320 | 600 | 2030 | [171] | ||
FAB Link | France - Menuel on Cherbourg Peninsula | UK - Exeter via Alderney | 210 (210/0) |
320 | 1400 | 2030 | IGBT | [172][173] | |
Nederwiek 1 | Netherlands - Borssele | Netherlands - Nederwiek 1 platform | 217 | 525 | 2000 | 2030 | [165][166] | ||
Nederwiek 2 | Netherlands - Maasvlakte | Netherlands - Nederwiek 2 platform | 525 | 2000 | 2030 | [174][168] | |||
BalWin1 | Germany - Wehrendorf | Germany - BalWin1 platform | 360 | 525 | 2000 | 2030 | [175][176] | ||
BalWin2 | Germany - Westerkappeln | Germany - BalWin2 platform | 380 | 525 | 2000 | 2031 | [175][176] | ||
SuedLink DC3 | Germany - Brunsbuettel | Germany - Grossgartach | 700 | ±525 | 2000 | 2027 | IGBT | Suppliers: VSC substations: Siemens Energy, DC cable: nkt
Common project of Tennet TSO and Transnet BW highlight: first 525kV fully underground DC cable project |
|
SuedLink DC4 | Germany - Wilster | Germany - Bergrheinfeld | 550 | ±525 | 2000 | 2027 | IGBT | Supplier substations: tbd
dc cable: Prysmian Common project of TenneT TSO and Transnet BW highlight: first 525kV fully underground DC cable project |
|
Tyrrhenian Link | Italy – Battipaglia | Italy – Sardinia | 970 | 1000 | 2028 | Connects mainland Italy to Sicily and Sardinia | [177] | ||
Adriatic Link | Italy – Abruzzo | Italy – Marche | 250 | 1000 | 2028 | [178] | |||
Estlink 3 | Finland | Estonia | 700–1000 | 2035 |
2 As of 9 December 2015, LitPol Link started trial operations.[179]
3 Caithness Moray HVDC serves a number of renewable energy sources in the north of Scotland - see map[180]
4 Contracts due to be placed in 2016.
5 Elia says construction expected to start in late 2017.
6 Date is that quoted to support the Shetland Wind Farm that SSE is a part investor in.[181]
7 Decision on project expected in 2017 following consultation - see SSE PD reference.
North America
[edit]Name |
Converter station 1 |
Converter station 2 |
Total Length (Cable/Pole) (km) |
Nominal Voltage (kV) |
Power (MW) |
Year |
Type |
Remarks |
Ref |
---|---|---|---|---|---|---|---|---|---|
HVDC Mechanicville–Schenectady | USA - Mechanicville, NY 42°54′45″N 73°40′49″W / 42.91250°N 73.68028°W |
USA - Schenectady, NY | 37 (0/37) |
12 | 5 | 1932 | Merc | Experimental, frequency conversion 40 to 60 Hz
Dismantled after WW II |
[182] |
Vancouver Island 1 | Canada - Delta, BC 49°5′31″N 123°2′31″W / 49.09194°N 123.04194°W |
Canada - North Cowichan, BC 48°49′39″N 123°42′55″W / 48.82750°N 123.71528°W |
75 (42/33) |
260 | 312 | 1968 - 2014 | Merc | Supplier: ASEA | [1] |
Pacific DC Intertie | USA - Celilo, OR 45°35′39″N 121°6′51″W / 45.59417°N 121.11417°W |
USA - Sylmar, CA 34°18′39″N 118°29′21″W / 34.31083°N 118.48917°W, 34°18′42″N 118°28′53″W / 34.31167°N 118.48139°W |
1362 (0/1362) |
±500 | 3100 | 1970 | Thyr | Transmission voltage ±400 kV until 1984 Maximum transmission power 1440 MW until 1982 From 1982 to 1984 1600 MW From 1984 to 1989 2000 MW Merc replaced by Thyr in 2004 Original supplier: ASEA, General Electric In 1989 upgraded by ABB In 2004 upgraded by ABB and Siemens |
[1][183][184] |
Nelson River Bipole 1 | Canada - Gillam, Manitoba 56°21′41″N 94°36′48″W / 56.36139°N 94.61333°W |
Canada - Rosser, Manitoba 49°59′39″N 97°25′39″W / 49.99417°N 97.42750°W |
895 (0/895) |
463.5 | 1854 | 1971 | Thyr | Used the largest mercury arc rectifiers ever built Original supplier: English Electric. In 1992/1993, Pole 1 upgraded to Thyr by Alstom. In 2004, Pole 2 upgraded to Thyr by Siemens. |
[1][185] |
Vancouver Island 2 | Canada - Delta, BC 49°5′31″N 123°2′31″W / 49.09194°N 123.04194°W |
Canada - North Cowichan, BC 48°49′39″N 123°42′55″W / 48.82750°N 123.71528°W |
75 (33/42) |
280 | 370 | 1977 - 2016 | Thyr | Supplier: General Electric | [1] |
Square Butte | USA - Center, ND (Young) 47°4′18″N 101°11′45″W / 47.07167°N 101.19583°W |
USA - Adolph, MN (Arrowhead) 46°46′25″N 92°17′39″W / 46.77361°N 92.29417°W |
749 (0/749) |
250 | 500 | 1977 | Thyr | Supplier: General Electric In 2004 Control system upgrade by ABB | [1][186][187] |
Nelson River Bipole 2 | Canada - Sundance, Manitoba 56°30′14″N 94°8′24″W / 56.50389°N 94.14000°W |
Canada - Rosser, Manitoba 49°59′39″N 97°25′49″W / 49.99417°N 97.43028°W |
940 (0/940) |
500 | 2000 | 1978-1985 | Thyr | Supplier: Siemens | [1][185] |
CU | USA - Underwood, ND (Coal Creek) 47°22′24″N 101°9′23″W / 47.37333°N 101.15639°W |
USA - Rockford, MN (Dickinson) 45°6′40″N 93°48′36″W / 45.11111°N 93.81000°W |
687 (0/687) |
400 | 1000 | 1979 | Thyr | Supplier: ABB In 2004, control system upgrade by ABB | [1][188] |
Path 27 | USA - Intermountain, UT 39°30′2″N 112°34′51″W / 39.50056°N 112.58083°W |
USA - Adelanto, CA 34°33′4″N 117°26′14″W / 34.55111°N 117.43722°W |
785 (0/785) |
±500 | 1920 | 1986 | Thyr | ||
Quebec - New England Transmission | Canada - Radisson, Quebec OpenStreetMap 53°43′33″N 77°44′17″W / 53.72583°N 77.73806°W |
Canada - Nicolet, QC 46°04′47″N 72°14′58″W / 46.07972°N 72.24944°W; USA - Ayer, MA 42°34′13″N 71°31′27″W / 42.57028°N 71.52417°W |
1105 (5/1100) |
450 | 2250 | 1991 | Thyr | 3 terminals[dubious – discuss] Converter stations near Windsor, Quebec and Monroe, New Hampshire were decommissioned in 2007. Supplier: ABB |
[1] |
Cross Sound Cable | USA - New Haven, Connecticut 41°17′12″N 72°54′8″W / 41.28667°N 72.90222°W |
USA - Shoreham, New York 40°57′33″N 72°52′3″W / 40.95917°N 72.86750°W |
40 (40/0) |
150 | 330 | 2002 | IGBT | Buried underwater cable Supplier: ABB |
[189] |
Neptune Cable | USA - Long Island (Hicksville) NY 40°45′38″N 73°33′4″W / 40.76056°N 73.55111°W |
USA -Sayreville, NJ 40°28′25.38″N 74°21′11.1″W / 40.4737167°N 74.353083°W |
105 (105/0) |
500 | 660 | 2007 | Thyr | Supplier: Siemens | [190] |
Trans Bay Cable | USA - Pittsburg, California 38°01′51″N 121°53′48″W / 38.03083°N 121.89667°W |
USA - San Francisco, CA 37°45′17″N 122°23′09″W / 37.75472°N 122.38583°W |
85 (85/0) |
200 | 400 | 2010 | IGBT | First HVDC system using Modular Multi-Level Converter
Supplier: Siemens, Pirelli |
[191][192][193] |
Eastern Alberta Transmission Line | Canada – Newell, AB 50°30′41″N 112°01′02″W / 50.51139°N 112.01722°W | Canada – Heathfield, AB 53°51′28″N 113°13′52″W / 53.85778°N 113.23111°W | 485 (0/485) | 500 | 1000 | 2015/2016 | Thyr | Supplier: Siemens | [194] |
Western Alberta Transmission Line | Canada – Genesee, AB 53°21′13″N 114°18′33″W / 53.35361°N 114.30917°W | Canada – Langdon, AB 50°57′37″N 113°43′11″W / 50.96028°N 113.71972°W | 350 (0/350) | 500 | 1000 | 2015 | Thyr | Supplier: Siemens | [194][195] |
Nelson River Bipole 3 | Canada - Keewatinohk, Manitoba 56°39′25″N 93°51′14″W / 56.65694°N 93.85389°W |
Canada - Riel, Manitoba 49°51′59″N 96°56′24″W / 49.86639°N 96.94000°W |
1324 (0/1324) |
500 | 2000 | 2018 | Thyr | Supplier: Siemens | [1][185] |
Labrador-Island Link | Canada - Muskrat Falls, NL | Canada - Soldiers Pond, NL | 1135 (35/1100) |
350 | 900 | 2017 | Thyr | Drilling for cable landfall began in 2014. Supplier: Alstom Grid |
[196][197] |
Maritime Link | Canada - Bottom Brook, NL 48°31′52″N 58°15′39″W / 48.53111°N 58.26083°W | Canada - Woodbine, NS 45°59′30″N 60°16′26″W / 45.99167°N 60.27389°W |
360 (170/190) |
200 | 500 | 2017 | IGBT | Right-of-way clearing began in 2014. Supplier: ABB |
[198][199][200][201] |
New England Clean Power Link | USA - Alburgh, VT | USA - Ludlow, VT | 248 (248/0) |
320 | 1000 | ? | Connects to Quebec | [202][203][204] [205] | |
TransWest Express | USA – Sinclair, WY | USA – Boulder City, NV | 1165 (0/1165) |
600 | 3000 | 2027 | Ground breaking in 2023 | [206][207][208] | |
Grain Belt Express | USA - Ford County, KS | USA - Sullivan County, IN | 750
(0/750) |
600 | 5000 | ? | [209] | ||
SOO Green | USA - Mason City, Iowa | USA - Plano, Illinois | 563 | 525 | 2100 | 2023 | Buried along railroad right-of-way Supplier: Siemens |
[210] | |
Clean Path NY | USA - Upstate New York | USA - New York City | 280 | 1300 | ? | [211] | |||
Champlain Hudson Power Express | Canada–New York border | USA - New York City | 545 | 1250 | 2025 | 60% submarine under Lake Champlain and 40% underground | [212] | ||
New England Clean Energy Connect | USA - Beattie Twp, ME | USA - Lewiston, ME | 314 | 1200 | 2024 | [213] | |||
SunZia Transmission | USA – Torrance County, NM | USA – Pinal County, AZ | 880 | 525 | 3000 | 2026 | Project combined with 3,500 MW wind project | [214] |
South America
[edit]Name |
Converter station 1 |
Converter station 2 |
Total Length (Cable/Pole) (km) |
Nominal Voltage (kV) |
Power (MW) |
Year |
Type |
Remarks |
Ref |
---|---|---|---|---|---|---|---|---|---|
Itaipu 1 | Brazil - Foz do Iguaçu, Paraná 25°27′58″S 54°32′33″W / 25.46611°S 54.54250°W |
Brazil - São Roque, São Paulo 23°40′2″S 47°6′19″W / 23.66722°S 47.10528°W |
785 (0/785) |
600 | 3150 | 1984 | Thyr | Supplier: ABB | [1] |
Itaipu 2 | Brazil - Foz do Iguaçu, Paraná 25°27′58″S 54°32′33″W / 25.46611°S 54.54250°W |
Brazil - São Roque, São Paulo 23°40′2″S 47°6′19″W / 23.66722°S 47.10528°W |
805 (0/805) |
600 | 3150 | 1987 | Thyr | Supplier: ABB | [1] |
Rio Madeira | Brazil, Porto Velho 08°54′53″S 63°57′27″W / 8.91472°S 63.95750°W |
Brazil, Araraquara 21°49′59″S 48°20′52″W / 21.83306°S 48.34778°W |
2375 (0/2375) |
600 | 7100 | 2013 | Thyr | The longest transmission link in the world Suppliers: ABB, Alstom |
[215] |
Xingu-Estreito (aka, Belo Monte 1) | Brazil - Anapu, Pará | Brazil - Ibiraci, Minas Gerais | 2077 (0/2077) | 800 | 4000 | 2017 | Thyr | Supplier: SIEMENS | [216] |
Xingu-Rio (aka, Belo Monte 2) | Brazil - Pará | Brazil - Rio de Janeiro | 2550 | 800 | 4000 | 2019 | Thyr | Supplier: NARI/XD/CET | [216] |
Back to back
[edit]Name |
Location |
Nominal Voltage (kV) |
Power (MW) |
Year |
Type |
Remarks |
Ref |
---|---|---|---|---|---|---|---|
Carnegie Steel Company B2B | USA - Pittsburgh, Pennsylvania | ? | ? | ? | Merc | built for an interconnection between 60 Hz-utility system and a 25 Hz System, dismantled | [217] |
Sakuma B2B | Japan - Sakuma 35°04′57″N 137°47′56″E / 35.08250°N 137.79889°E |
125 | 300 | 1965 | Merc | replaced in 1993 by new converter using light-triggered thyristors | |
Eel River B2B | Canada - Eel River, NB 48°01′05″N 66°26′39″W / 48.01806°N 66.44417°W |
80 | 320 | 1972 | Thyr | life extension project 2014 | [218][219] |
David A. Hamil B2B | USA - Stegall, Nebraska 41°49′15″N 103°56′32″W / 41.82083°N 103.94222°W |
±50 | 100 | 1977 | Thyr | Supplier: GE | |
Shin Shinano B2B | Japan - Shin Shinano 36°08′14″N 137°52′58″E / 36.13722°N 137.88278°E |
125 | 600 | 1977 | Thyr | Supplier: Toshiba, Hitachi | |
Acaray B2B | Paraguay - Ciudad de Este 25°27′26″S 54°37′26″W / 25.45722°S 54.62389°W |
25.6 | 50 | 1981 | Thyr | ||
Vyborg B2B | Russia - Vyborg 60°40′49″N 28°55′7″E / 60.68028°N 28.91861°E |
±85 | 1065 | 1982 | Thyr | extended up to 1420 MW in 2001 | |
Dürnrohr B2B | Austria - Dürnrohr 48°19′46″N 15°52′48″E / 48.32944°N 15.88000°E |
145 | 550 | 1983 | Thyr | shut down in October 1996, dismantled in 2007 | |
Artesia, New Mexico (Eddy County HVDC B2B) B2B | USA - Artesia, NM 32°48′51.7″N 104°14′29.6″W / 32.814361°N 104.241556°W |
82 | 200 | 1983 | Thyr | ||
Chateauguay B2B | Canada – Châteauguay, QC 45°15′11″N 73°52′11″W / 45.25306°N 73.86972°W |
140 | 1000 | 1984 | Thyr | Control system upgrade by ABB in 2009 | [220][221] |
Oklaunion B2B | USA - Oklaunion, TX 34°5′6″N 99°11′1″W / 34.08500°N 99.18361°W |
82 | 200 | 1984 | Thyr | ABB replacement in 2014 | [222][223]
|
Blackwater, New Mexico B2B | USA - Blackwater, NM 34°18′3″N 103°10′27″W / 34.30083°N 103.17417°W |
57 | 200 | 1984 | Thyr | Valve cooling and control systems upgrade by ABB in 2009 | [224][225] |
Madawaska, Quebec B2B | Canada - Dégelis, QC 47°30′31″N 68°31′25″W / 47.50861°N 68.52361°W |
140 | 350 | 1985 | Thyr | ||
Miles City, Montana B2B | USA - Miles City, MT 46°24′31″N 105°47′36″W / 46.40861°N 105.79333°W |
82 | 200 | 1985 | Thyr | ||
Highgate, VT B2B | USA - Highgate, VT 44°56′17″N 73°3′15″W / 44.93806°N 73.05417°W |
56 | 200 | 1985 | Thyr | Refurbishment by ABB in 2012, | [226] |
Uruguaiana B2B | Brazil - Uruguaiana 29°48′22″S 57°0′17″W / 29.80611°S 57.00472°W |
17.9 | 53.9 | 1986 | Thyr | ||
Broken Hill B2B | Australia - Broken Hill 31°59′10″S 141°25′9″E / 31.98611°S 141.41917°E |
8.33 | 40 | 1986 | Thyr | ||
Virginia Smith B2B | USA - Sidney, NE 41°9′51″N 102°59′15″W / 41.16417°N 102.98750°W |
50 | 200 | 1988 | Thyr | [227] | |
Vindhyachal B2B | India - Vindhyachal 24°05′38″N 82°40′44″E / 24.09389°N 82.67889°E |
176 | 500 | 1989 | Thyr | ||
McNeill B2B | Canada - Mc Neill, AB 50°35′56″N 110°01′25″W / 50.59889°N 110.02361°W |
42 | 150 | 1989 | Thyr | Supplier: Alstom | |
Wolmirstedt B2B | Germany - Wolmirstedt 52°16′21″N 11°38′10″E / 52.27250°N 11.63611°E |
160 | 600 | (1992) | Thyr | construction work was stopped after reunification, static inverter hall is today part of a recycling yard | |
Etzenricht B2B | Germany - Etzenricht 49°37′52″N 12°6′56″E / 49.63111°N 12.11556°E |
160 | 600 | 1993 | Thyr | shut down in October 1995, dismantled in 2009 | |
Vienna-Southeast B2B | Austria - Vienna 48°7′22″N 16°25′6″E / 48.12278°N 16.41833°E |
142 | 600 | 1993 | Thyr | shut down in October 1996, dismantled in 2007 | |
Chandrapur B2B | India - Chandrapur 20°5′21″N 79°8′36″E / 20.08917°N 79.14333°E |
205 | 2x500 | 1998 | Thyr | Supplier: Alstom | |
Welsh HVDC Converter Station B2B | USA - Titus County, TX 33°03′30.3″N 94°50′36.54″W / 33.058417°N 94.8434833°W |
162 | 600 | 1998 | Thyr | ||
Garabi HVDC | Brazil - Garabi 28°15′19″S 55°40′18″W / 28.25528°S 55.67167°W |
±70 | 2200 | 1999 | Thyr | Brazil-Argentina Interconnection. Supplier: ABB In 2002, the second phase 'Garabi 2' was supplied by ABB . | [228] |
Vizag 1 | India - Visakhapatnam Gazuwaka 17°38′33″N 83°7′57″E / 17.64250°N 83.13250°E |
205 | 500 | 1999 | Thyr | Supplier: Alstom | |
Minami-Fukumitsu B2B | Japan - Minami - Fukumitsu 36°29′46″N 136°54′57″E / 36.49611°N 136.91583°E |
125 | 300 | 1999 | Thyr | ||
Rivera B2B | Uruguay - Rivera 30°56′29″S 55°33′34″W / 30.94139°S 55.55944°W |
22 | 70 | 2000 | Thyr | Supplier: Alstom | |
Eagle Pass, Texas B2B | USA - Eagle Pass, TX 28°42′58.8″N 100°29′26.88″W / 28.716333°N 100.4908000°W |
15.9 | 36 | 2000 | IGBT | ||
Sasaram B2B | India - Sasaram 25°07′42″N 83°42′29″E / 25.12833°N 83.70806°E |
205 | 500 | 2003 | Thyr | Supplier: Alstom | |
Rapid City DC Tie B2B | USA - Rapid City, SD 44°00′37″N 103°9′54″W / 44.01028°N 103.16500°W |
13 | 200 | 2003 | Thyr | [229][230] | |
Vizag 2 | India - Visakhapatnam 17°38′26″N 83°8′10″E / 17.64056°N 83.13611°E |
176 | 500 | 2005 | Thyr | Installed at Gazuwaka. Supplier:ABB. This is similar in specs to Vizag I and connects the Eastern and Southern grids. | [231] |
Lingbao B2B | China - Lingbao 34°32′56″N 110°50′49″E / 34.54889°N 110.84694°E |
168 | 360 | 2005 | Thyr | Supplier: NR(Protection&Control), Extension project 2010: Supplier: ABB;C-EPRI Electric Power Engineering Co., Ltd | [232][233] |
Lamar Co., Colorado B2B | USA - Lamar, CO 38°12′25.08″N 102°31′43.92″W / 38.2069667°N 102.5288667°W |
63.6 | 210 | 2005 | Thyr | Supplier: Siemens; Combination of B2B HVDC & Grid Power Flow Controller (GPFC) | [234] |
Higashi-Shimuzu B2B | Japan - Shimuzu 35°03′24″N 138°29′58″E / 35.05667°N 138.49944°E |
125 | 300 | 2006 | Thyr | ||
Sharyland B2B | USA - Mission, TX 26°10′01″N 98°19′25″W / 26.16694°N 98.32361°W |
21 | 150 | 2007 | Thyr | ||
Al Fadhili B2B | Saudi Arabia - Al Fadhili 26°53′52″N 49°20′47″E / 26.89778°N 49.34639°E |
222 | 3x600 | 2008 | Thyr | Used mainly for Dynamic Reserve Power Sharing rather than economic energy transfer. Supplier: Alstom | [235] |
Outaouais B2B | Canada - Buckingham, QC 45°36′01″N 75°26′47″W / 45.60028°N 75.44639°W |
315 | 2x625 | 2009 | Thyr | Expected completion 2009. Supplier:ABB | [56] |
Heihe B2B | China - Heihe 50°15′19″N 127°25′37″E / 50.25528°N 127.42694°E |
±125 | 750 | 2011 | Thyr | Supplier: NR(Protection&Control)[236] | |
Gaoling B2B | China - Gaoling 40°10′49″N 120°00′22″E / 40.18028°N 120.00611°E |
±500 | 1500 | 2008 | Thyr | ||
Shandong - East B2B | China | 1200 | 2011 | Thyr | |||
Melo B2B | Uruguay - Melo 32°25′02″S 54°05′34″W / 32.41722°S 54.09278°W |
±79 | 500 | 2011 | Thyr | Supplier:Alstom | |
North - Central B2B | China | 1000 | 2012 | Thyr | |||
Rio Madeira B2B | Brazil – Porto Velho 8°54′46″S 63°57′27″W / 8.91278°S 63.95750°W |
100 | 600 | 2013 | Thyr | Supplier: ABB[237] | [238][239][240][241] |
Ridgefield B2B ( Hudson Project) | USA - Ridgefield, NJ 40°49′56″N 74°00′44″W / 40.83222°N 74.01222°W |
185 | 660 | 2013 | Thyr | Supplier: Siemens[242] | |
Bheramara B2B | Bangladesh – Bheramara 24°04′03″N 89°0′04″E / 24.06750°N 89.00111°E | 158 | 500 | 2013 | Thyr | ||
Akhaltsikhe B2B | Georgia - Akhaltsikhe 41°42′26″N 43°06′35″E / 41.70722°N 43.10972°E |
96 | 700 | 2013 | Thyr | Supplier: Siemens | [243] |
Mackinac B2B | USA - Saint Ignace, MI 45°51′31″N 84°44′18″W / 45.85861°N 84.73833°W |
70 | 200 | 2014 | IGBT | Supplier: ABB | [244] |
Railroad DC Tie | USA - Mission, TX 26°10′01″N 98°19′25″W / 26.16694°N 98.32361°W |
21 | 150 | 2014 | Thyr | ||
Alytus B2B | Lithuania - Alytus 54°26′19″N 23°58′02″E / 54.43861°N 23.96722°E |
±70 | 500 | 2015 | Thyr | [245] | |
Mogocha B2B | Russia - Mogocha 53°43′30″N 119°47′22″E / 53.72500°N 119.78944°E |
±32 | 2x100 | 2017 | IGBT | [246] | |
Yu - E B2B | China-Chongqing, China-Hubei | ±420 | 4x1250 | 2017 | VSC-HVDC | Supplier: XJ Group Corporation(2x1250MW), C-EPRI Electric Power Engineering Co., Ltd(1x1250MW), Rongxin Power Electronic Co., Ltd. (1x1250MW) | |
Khani B2B | Russia - Khani 56°55′09″N 119°59′24″E / 56.91917°N 119.99000°E |
±32 | 2x100 | 2019 | IGBT | [246] | |
Van B2B | Turkiye - İran 38°58′37″N 43°31′58″E / 38.97694°N 43.53278°E |
420 | 600 | 2021 | IGBT | Supplier:NR-TEIAS | |
Bentwisch B2B | Germany - Bentwisch 54°06′04″N 12°12′56″E / 54.10111°N 12.21556°E |
±140 | 410 | 2019 | IGBT | ||
Tres Amigas SuperStation | USA - Clovis, NM | ? | 5000 | ? | IGBT |
Maps
[edit]Europe
[edit]- Shetland HVDC Connection
- Caithness Moray HVDC
- Western Isles HVDC connection
- NorthConnect
- North Sea Link: Kvilldal, Norway – Blyth, UK
- Eastern HVDC Link
- Moyle: Auchencrosh, UK – Ballycronan More, Northern Ireland, UK
- Western HVDC Link
- East–West Interconnector: Leinster, Ireland – Shotton, Wales, UK
- Celtic Interconnector
- FAB Link
- IFA-2
- HVDC Cross-Channel: Les Mandarins, France – Sellindge, UK
- Nemo Link
- BritNed: UK – Netherlands
- Aachen Liège Electricity Grid Overlay (ALEGrO)[247]
- Viking Link
- HVDC DolWin1, HVDC DolWin2, HVDC DolWin3
- HVDC SylWin1
- HVDC HelWin1, HVDC HelWin2
- HVDC BorWin1, HVDC BorWin2, HVDC BorWin3
- NorNed: Feda, Norway – Eemshaven, Netherlands
- NORD.LINK: Germany – Norway
- Skagerrak 1, 2, 3, and 4: Tjele, Denmark – Kristiansand, Norway
- Konti-Skan 1 and 2: VesterHassing, Denmark – Stenkullen, Sweden
- StoreBælt: Fyn, Denmark – Zealand, Denmark
- Baltic Cable: Lübeck- Herrenwyk, Germany – Kruseberg, Sweden
- Kontek: Bjæverskov, Denmark – Bentwisch, Germany
- SydVästlänken
- SwePol: Stärnö, Sweden – Wierzbięcin (Słupsk), Poland
- LitPol Link
- NordBalt
- HVDC Visby–Näs
- Gotland: Västervik, Sweden – Ygne, Sweden
- Fenno-Skan: Rauma, Finland – Dannebo, Sweden, Fenno-Skan 2
- ÅL-link
- Estlink: Harku, Estonia – Espoo, Finland
- Estlink 2
- Cometa: Valencia, Spain – Mallorca, Spain
- INELFE Baixas - Santa Llogaia[248]
- HVDC Italy–Corsica–Sardinia: "SACOI" – Codrongianos, Sardinia, Italy – Lucciana, Corsica, France – Suvereto, Italy (mainland)
- SAPEI, Sardinia – Italian mainland
- HVDC MON.ITA Project
- HVDC Italy-Greece: Arachthos, Greece – Galatina, Italy
- EuroAsia Interconnector
- EuroAfrica Interconnector
- Greenlink
- France-Italy via Fréjus Road Tunnel
- ElecLink: via Channel Tunnel
- INELFE Biscay Gulf[249]
- NeuConnect: Isle of Grain, UK – Wilhelmshaven, Germany
See also
[edit]- Asian Super Grid
- Desertec
- Electrode line
- European super grid
- High-voltage direct current
- List of high voltage underground and submarine cables
- Lyon-Moutiers DC transmission scheme
- Scotland-Norway interconnector
- HVDC converter station
- Super grid
- Submarine power cable
- Transmission tower
- Uno Lamm
- Valve hall
References
[edit]- ^ a b c d e f g h i j k l m n o p q r s t u v w x y z aa ab ac ad ae af ag ah ai aj ak al am an ao ap aq ar as at au av HVDC Projects List, March 2012 - Existing or Under Construction (PDF) Archived 2014-02-01 at the Wayback Machine, Ece.uidaho.edu, accessed in February 2014
- ^ "References - ABB". New.abb.com. Archived from the original on 5 January 2018. Retrieved 16 January 2018.
- ^ "ABB wins $50 million HVDC order in Mozambique". Abb.com. Archived from the original on 17 January 2018. Retrieved 16 January 2018.
- ^ "References - ABB". Abb.com. Archived from the original on 12 December 2013. Retrieved 16 January 2018.
- ^ "ABB wins $107 million power order in Africa". Abb.com. Archived from the original on 17 January 2018. Retrieved 16 January 2018.
- ^ "Winne.com - Report on Congo DRC, Paving the reconstruction". Winne.com. Archived from the original on 3 November 2018. Retrieved 16 January 2018.
- ^ "ABB commissions Caprivi link". 1 January 2011. Archived from the original on 22 February 2014. Retrieved 15 February 2014.
- ^ "Energy crisis: Longest cable in WORLD will be based in Britain and power 7million homes". www.express.co.uk. July 2022. Retrieved 3 July 2022.
- ^ "The Morocco - UK Power Project". xlinks.co. Retrieved 3 July 2022.
- ^ "Basslink". Basslink.com.au. Archived from the original on 17 January 2018. Retrieved 16 January 2018.
- ^ Joerg Dorn; Dietmar Retzmann; Cristen Schimpf; Dag Soerangr (2007-11-06). "HVDC Solutions for System Interconnection and Advanced Grid Access" (PDF). EPRI HVDC Conference 2007-09-13 to 14. Siemens: 44. Archived (PDF) from the original on 2013-01-14. Retrieved 15 February 2014.
- ^ "HVDC Inter-Island Link Project - Transpower". Transpower New Zealand. Archived from the original on February 10, 2013. Retrieved 15 February 2014.
- ^ "Fact Sheet - 1500 MW Marinus Link - Nov 2021" (PDF). www.marinuslink.com.au. Retrieved 20 December 2021.
- ^ "References - ABB". New.abb.com. Archived from the original on 20 January 2016. Retrieved 16 January 2018.
- ^ "References - ABB". New.abb.com. Archived from the original on 27 January 2017. Retrieved 16 January 2018.
- ^ "References - ABB". New.abb.com. Archived from the original on 9 January 2018. Retrieved 16 January 2018.
- ^ "HVDC in China" (PDF). Dsius.com. Archived (PDF) from the original on 24 March 2017. Retrieved 16 January 2018.
- ^ "ROLE OF THREE GORGES - CHANGZHOU HVDC IN INTERCONNECTING CENTRAL AND EAST CHINA" (PDF). ABB. Archived from the original (PDF) on February 16, 2012. Retrieved 2014-02-10.
- ^ "References - ABB". New.abb.com. Archived from the original on 8 September 2019. Retrieved 16 January 2018.
- ^ "References - ABB". New.abb.com. Archived from the original on 11 July 2017. Retrieved 16 January 2018.
- ^ "References - ABB". New.abb.com. Archived from the original on 20 January 2016. Retrieved 16 January 2018.
- ^ "References - ABB". New.abb.com. Archived from the original on 20 January 2016. Retrieved 16 January 2018.
- ^ "References - ABB". New.abb.com. Archived from the original on 16 May 2018. Retrieved 16 January 2018.
- ^ "China-EPRI Electric Power Engineering Co., Ltd". 2 July 2013. Archived from the original on 2 July 2013. Retrieved 16 January 2018.
- ^ "China-EPRI Electric Power Engineering Co., Ltd". 2 July 2013. Archived from the original on 2 July 2013. Retrieved 16 January 2018.
- ^ "References - ABB". New.abb.com. Archived from the original on 6 April 2018. Retrieved 16 January 2018.
- ^ world's first multi-terminal VSC HVDC transmission project Archived 2014-03-01 at the Wayback Machine, accessed in February 2014
- ^ world's first multi-terminal VSC HVDC transmission project , accessed in February 2014 Archived February 8, 2014, at the Wayback Machine
- ^ "Southern Hami-Zhengzhou ±800kV UHVDC Transmission Project, Second Xinjiang-Northwest Main Grid 750kV HVDC Transmission Line Start Construction to Build the Silk Road of Electricity Connecting the Western Frontier with the Central Plains" (Press release). State Grid Corporation of China. 2012-05-14. Retrieved 2012-11-27.
- ^ "China-EPRI Electric Power Engineering Co., Ltd". Archived from the original on 2014-04-20. Retrieved 2014-04-19.
- ^ "ABB wins power transformers order in China worth over $100 million" (Press release). ABB. 2012-11-27. Retrieved 2012-11-27.
- ^ "China XD to supply equipment for SGCC's UHVDC project". Global Transmission Report. 2012-10-16. Archived from the original on 2012-10-27. Retrieved 2012-11-27.
- ^ "New order from SGCC: Siemens' biggest HVDC transformer order to date" (PDF). Siemens. 2015. Archived from the original (PDF;101KiB) on 2019-01-31. Retrieved 2019-01-31.
- ^ "Preliminary Assessments for Hami-Zhengzhou and Xiluodu-Western Zhejiang UHV DC Projects Completed" (Press release). State Grid Corporation of China. 2012-04-12. Retrieved 2012-11-27.
- ^ [1][permanent dead link ], Alstom Press Release, 7 July 2014.
- ^ "Error - LS Cable". m.lscns.com. Archived from the original on 19 November 2015. Retrieved 16 January 2018.
- ^ Zhoushan Multi-terminal DC Interconnection, accessed in February 2014 Archived April 14, 2014, at the Wayback Machine
- ^ "Champa ±800 kV UHVDC" (PDF). Alstom.com. Archived from the original (PDF) on 27 January 2015. Retrieved 16 January 2018.
- ^ "References - ABB". New.abb.com. Archived from the original on 12 January 2018. Retrieved 16 January 2018.
- ^ "The New Hokkaido-Honshu HVDC Link" (PDF).[permanent dead link ]
- ^ "New Hokkaido-Honshu VSC HVDC Commissioned, Interconnecting Hokkaido and the Main Island of Honshu". 28 March 2019. Archived from the original on 17 October 2020. Retrieved 7 January 2021.
- ^ "Matiari To Lahore ±660kV HVDC Transmission Line Project". Archived from the original on 2020-11-04. Retrieved 2021-02-02.
- ^ "Case Study Zhangbei DC Grid" (PDF). Archived (PDF) from the original on 2020-12-05. Retrieved 2021-01-07.
- ^ "India to Build Longest 800kV UHVDC Transmission Line". 11 January 2017. Archived from the original on 18 January 2017. Retrieved 20 January 2017.
- ^ "Central Asia-South Asia Electricity Transmission and Trade Project". 10 May 2016. Retrieved 23 July 2023.
- ^ "HVDC Classic Reference list". Retrieved 23 July 2023.
- ^ "https://www.ctuil.in/uploads/ists_consultation_meeting/agenda/169829919767Meeting%20Notice%20and%20Agenda_24th%20CMETS-ER_final.pdf" (PDF).
{{cite web}}
: External link in
(help)|title=
- ^ "The Gotland HVDC link". abb.com. Archived from the original on 2014-07-14. Retrieved 2014-05-30.
- ^ Kingsnorth Power Station brochure on the DC system (Kingsnorth to London HVDC power reinforcement scheme - dated 1975)
- ^ a b "Skagerrak". abb.com. Archived from the original on 2016-01-20. Retrieved 2014-05-02.
- ^ "New lease on life for northern European power link". abb.com. Archived from the original on 2013-12-12. Retrieved 2013-12-06.
- ^ "ABB wins $180 million order for Norway-Denmark power transmission link". abb.com. Archived from the original on 2013-12-12. Retrieved 2013-12-06.
- ^ "National Grid info on IFA". Interconnections - France. National Grid plc. Archived from the original on 20 August 2016. Retrieved 31 December 2015.
- ^ "SwePol Link". abb.com. Archived from the original on 2018-10-25. Retrieved 2014-01-16.
- ^ "Mutual Energy". Mutual Energy. Archived from the original on 9 January 2016. Retrieved 31 December 2015.
- ^ a b c d e f g h Working Group on HVDC and FACTS Bibliography and Records (2008-07-07). "HVDC PROJECTS LISTING" (PDF). IEEE Transmission and Distribution Committee. Archived from the original (PDF) on 2008-12-15. Retrieved 2008-12-19.
- ^ "BritNed cable live today" (Press release). BritNed. 2011-04-01. Retrieved 2011-04-01.[dead link ]
- ^ "BritNed organisation". BritNed. Archived from the original on 9 January 2016. Retrieved 5 January 2016.
- ^ "National Grid on BritNed". Interconnectors - Netherlands. National Grid plc. Archived from the original on 20 January 2016. Retrieved 5 January 2016.
- ^ "SAPEI". abb.com. Archived from the original on 2017-04-15. Retrieved 2014-05-02.
- ^ "ABB wins $180 million order for undersea power link in Italy". abb.com. Archived from the original on 2014-05-02. Retrieved 2014-05-02.
- ^ "ABB commissions power link to Valhall offshore platform". abb.com (Press release). Archived from the original on 20 January 2016. Retrieved 5 January 2016.
- ^ "BorWin1". abb.com. Archived from the original on 2017-11-23. Retrieved 2014-05-02.
- ^ "ABB wins power order worth more than $400 million for world's largest offshore wind farm". abb.com. Archived from the original on 2014-05-02. Retrieved 2014-05-02.
- ^ BorWin1 - Transmission project. YouTube. 7 July 2010. Archived from the original on 2021-12-21.
- ^ "Overview of EirGrid Connection" (PDF). Paper presented at UPEC 2013. ABB. Archived (PDF) from the original on 20 January 2016. Retrieved 31 December 2015.
- ^ "ABB Fenno-Skan - ABB HVDC Reference Projects in Europe (HVDC References)". abb.com. Archived from the original on 2015-04-20.
- ^ "ABB to upgrade transmission control for Scandinavian power interconnector". abb.com. Archived from the original on 2013-12-12. Retrieved 2013-12-06.
- ^ "New Fenno-Skan 2 HVDC pole with an upgrade of the existing Fenno-Skan 1 pole". Search-ext.abb.com. Archived from the original on 12 December 2013. Retrieved 25 September 2017.
- ^ "Åland". abb.com. Archived from the original on 2013-12-12. Retrieved 2013-12-06.
- ^ "ABB wins $130-million HVDC order for subsea power transmission link in Finland". abb.com. Archived from the original on 2013-12-12. Retrieved 2013-12-06.
- ^ "Åland Link project management" (PDF). pöyry case summary. Pöyry SwedPower AB. Archived (PDF) from the original on 20 January 2016. Retrieved 8 January 2016.
- ^ "Wir bringen die Windenergie vom Meer an Land - TenneT TSO GmbH". tennettso.de. Archived from the original on 2011-11-20. Retrieved 2011-03-31.
- ^ "DolWin1". abb.com. Archived from the original on 2011-03-25. Retrieved 2011-01-24.
- ^ "Wir bringen die Windenergie vom Meer an Land - TenneT TSO GmbH". Tennettso.de. Archived from the original on 19 July 2011. Retrieved 25 September 2017.
- ^ "2014 INELFE, France-Spain" (PDF) (Press release). Siemens. 2011-01-12. Archived (PDF) from the original on 2013-12-25. Retrieved 2012-05-13.
- ^ "REE on INELFE". Spain-France underground interconnection. Red Eléctrica da España. Archived from the original on 20 January 2016. Retrieved 5 January 2016.
- ^ "INEFE ready for testing". HVDC link between France and Spain. Siemens. Archived from the original on 20 January 2016. Retrieved 5 January 2016.
- ^ "Crossing Mountains to Connect Two Countries". TD world. 8 June 2017. Archived from the original on 21 June 2017. Retrieved 21 June 2017.
- ^ "Russia's Power Grip Over Baltics Ending With Billion-Euro Cables". Bloomberg. Archived from the original on 2016-03-19. Retrieved 11 August 2016.
- ^ "LITPOL Link". litpol-link.com. Archived from the original on 2013-12-30. Retrieved 2013-12-06.
- ^ "ABB wins $110 million power order to interconnect Lithuania and Poland". abb.com. Archived from the original on 2013-12-12. Retrieved 2013-12-06.
- ^ "LitPol Link". Abb.com. Archived from the original on 2013-12-12. Retrieved 2013-12-06.
- ^ "NordBalt". Archived from the original on 21 December 2014. Retrieved 12 January 2015.
- ^ "ABB press release". ABB sets world record. ABB. Archived from the original on 25 December 2015. Retrieved 5 January 2016.
- ^ "Wir bringen die Windenergie vom Meer an Land - TenneT TSO GmbH". tennettso.de. Archived from the original on 2011-11-20. Retrieved 2011-03-31.
- ^ "ABB wins $270 million order from Statoil for world's largest offshore gas platform". abb.com. Archived from the original on 2013-12-12. Retrieved 2013-12-06.
- ^ "Inauguration event of ABB technologies at the Troll A platform in Norway". abb.com. Archived from the original on 2013-12-12. Retrieved 2013-12-06.
- ^ "The Troll area". statoil.com. Archived from the original on 2014-09-25. Retrieved 2013-12-06.
- ^ "ABB signs US$ 230 million in contracts with Statoil". abb.com. Archived from the original on 2013-12-12. Retrieved 2013-12-06.
- ^ "ABB HVDC Light - Electrical/Integrated Project Solutions (Offshore Production)". abb.com. Archived from the original on 2013-12-12. Retrieved 2013-12-06.
- ^ "Very high voltage synchronous motors". abb.com. Archived from the original on 2013-12-12. Retrieved 2013-12-06.
- ^ "DolWin2". Archived from the original on 1 October 2013. Retrieved 12 January 2015.
- ^ "Offshore wind energy: TenneT awards "DolWin3"project to Alstom, marking next step in Germany's energy turnaround". alstom.com. Archived from the original on 2015-02-12. Retrieved 2015-02-12.
- ^ "Nexans wins major subsea cable contract for Terna's new HVDC power interconnection between Italy and Montenegro". 30 October 2012. Archived from the original on 20 January 2016. Retrieved 6 November 2015.
- ^ "Toshiba wins EPC Contract for HVDC power conversion system". Toshiba Press Release. 7 December 2012. Archived from the original on 18 October 2015. Retrieved 6 November 2015.
- ^ "HVDC MON.ITA Project" (PDF). Terna Crna Gora. 27 January 2014. Archived (PDF) from the original on 20 January 2016. Retrieved 6 November 2015.
- ^ "Q&A". Western HVDC. Archived from the original on 22 March 2015. Retrieved 28 March 2015.
- ^ "NG ETYS 2015". Electricity 10 year statement. National Grid plc. Archived from the original on 21 December 2015. Retrieved 31 December 2015.
- ^ "Caithness Moray HVDC". Caithness Moray. SSE Power Distribution. Archived from the original on 20 January 2016. Retrieved 3 January 2016.
- ^ "ABB information". Caithness Moray HVDC Link. ABB. Archived from the original on 20 January 2016. Retrieved 3 January 2016.
- ^ Kabel til Holland – COBRA
- ^ "Energienet in English". Cable to NL - COBRACable. Energienet.DK. Archived from the original on 20 January 2016. Retrieved 4 January 2016.
- ^ "COBRAcable". TenneT. Archived from the original on 27 February 2017. Retrieved 26 February 2017.
- ^ "Works starts in Eemshaven on COBRAcable – a 'green' subsea electricity highway between the Netherlands and Denmark". TenneT. 3 January 2017. Archived from the original on 27 February 2017. Retrieved 26 February 2017.
- ^ "Offshore wind : Cobra cable" (PDF). Alstom.com. Archived (PDF) from the original on 27 February 2017. Retrieved 16 January 2018.
- ^ a b "Johan Sverdrup powered from shore". equinor.com (Press release). October 9, 2018. Archived from the original on 2020-06-25. Retrieved 2020-03-27.
- ^ "Alstom will supply converter stations to Italy-France interconnector - Enerdata". Enerdata.net. Archived from the original on 21 April 2016. Retrieved 16 January 2018.
- ^ New strategic interconnection Italy-France for Terna R. I. and RTE Archived 2015-04-03 at the Wayback Machine, Prysmian Press Release, 26 March 2015.
- ^ "RTE on France Italy link". Savoie-Piémont: 190 km. RTE France. Archived from the original on 20 January 2016. Retrieved 7 January 2016.
- ^ "Terna on Italy France link". Italy - France, the invisible line. Terna. Archived from the original on 20 January 2016. Retrieved 7 January 2016.
- ^ "Nemo Link news June '15". Nemo Link news June '15. Nemo Link. Archived from the original on 4 March 2016. Retrieved 31 December 2015.
- ^ "Nemo Link". Nemo Link. Archived from the original on 10 January 2016. Retrieved 31 December 2015.
- ^ "Siemens re Nemo Link". Siemens wins major HVDC order to connect British and Belgian power grid. Siemens. Archived from the original on 20 January 2016. Retrieved 13 January 2016.
- ^ "ALEGrO Project". ALEGrO Project. Elia. Archived from the original on 30 January 2016. Retrieved 24 January 2016.
- ^ "Siemens Energy supplies HVDC technology for electricity link between Germany and Belgium". www.windtech-international.com. 10 November 2020. Archived from the original on 10 November 2020. Retrieved 10 November 2020.
- ^ "ALEGrO". www.amprion.net (in German). Archived from the original on 2021-01-27. Retrieved 2021-03-29.
- ^ "Elia infrastructure project". Archived from the original on 2020-11-01. Retrieved 2021-03-29.
- ^ "Siemens Energy liefert HGÜ-Technik für erste Stromverbindung zwi ..." press.siemens-energy.com (in German). Retrieved 2021-03-29.
- ^ "IFA2 - National Grid". France - National Grid. National Grid plc. Archived from the original on 20 August 2016. Retrieved 3 January 2016.
- ^ "IFA2 - RTE info". Interconnection France Angleterre (in French). RTE. Archived from the original on 20 January 2016. Retrieved 3 January 2016.
- ^ "IFA2 Brochure" (PDF). IFA2 brochure d'information. RTE. Archived from the original (PDF) on 2 November 2014. Retrieved 4 January 2016.
- ^ "IFA2: low-carbon electricity now flowing through second UK-France interconnector". National Grid. Archived from the original on 22 January 2021. Retrieved 27 January 2021.
- ^ "Riesen-Seekabel NordLink: Deutschland nutzt Norwegen jetzt als Batterie". Spiegel.de (in German). 2021-04-12. Archived from the original on 2021-06-08.
- ^ "Heading for British clarification of interconnector framework conditions". Archived from the original on 29 November 2014. Retrieved 12 January 2015.
- ^ "Cable to the UK". Statnett. 2014. Archived from the original on 2014-10-30. Retrieved 2014-11-20.
- ^ "€1.5 billion contracts awarded to build the world's longest interconnector". statnett. Archived from the original on 2015-08-17. Retrieved 2015-09-03.
- ^ "What is NSN Link? | NSN Link". nsninterconnector.com. Archived from the original on 2015-08-01. Retrieved 2015-09-03.
- ^ "ElecLink". Eleclink. Archived from the original on 20 January 2016. Retrieved 3 January 2016.
- ^ "Foundation laid for UK-France link". reNEWS - Renewable Energy News. 23 February 2017. Archived from the original on 27 February 2017. Retrieved 26 February 2017.
- ^ Skopljak, Nadja (2023-02-14). "Two months after production start, Johan Sverdrup Phase 2 officially opens". Offshore Energy. Retrieved 2024-07-27.
- ^ Cable to England – Viking Link
- ^ "Viking Link". Viking Link. Archived from the original on 20 January 2016. Retrieved 31 December 2015.
- ^ "DolWin6 - TenneT". Archived from the original on 2020-04-04. Retrieved 2020-03-27.
- ^ "New record in the German North Sea: TenneT commissions DolWin6 and expands connection capacity to more than 8,000 Megawatt". TenneT. Retrieved 2024-07-27.
- ^ a b "ABB and Aibel net Dogger Bank bounty | 4C Offshore News". Archived from the original on 2020-03-27. Retrieved 2020-03-27.
- ^ a b "NKT confirms order for Dogger Bank offshore Wind Farms Creyke Beck A/B". Archived from the original on 2020-03-27. Retrieved 2020-03-27.
- ^ Memija, Adnan (2023-10-10). "First Power Flows from World's Largest Offshore Wind Farm". Offshore Wind. Retrieved 2024-07-27.
- ^ "Caithness". Caithness HVDC. SSE PD. Archived from the original on 20 January 2016. Retrieved 1 January 2016.
- ^ "Shetland HVDC Link". Shetland. SSE Power Distribution. Archived from the original on 20 January 2016. Retrieved 31 December 2015.
- ^ "Shetland HVDC -4C". Shetland HVDC Interconnector. 4Coffshore. Archived from the original on 20 January 2016. Retrieved 31 December 2015.
- ^ "DolWin5 - TenneT". Archived from the original on 2020-04-03. Retrieved 2020-03-27.
- ^ "Home | Ariadne Interconnection". www.ariadne-interconnection.gr. Retrieved 2024-02-27.
- ^ "Grüner Strom für die Zukunft – Grundstein für Konverter im Projekt BorWin5 zur Umwandlung und Einspeisung in Garrel/Ost gelegt". TenneT (in German). Retrieved 2024-07-27.
- ^ "Dogger Bank HVDC Connection | Hitachi Energy". www.hitachienergy.com. Retrieved 2024-07-27.
- ^ "Dogger Bank Wind Farm, UK". www.nkt.com. Retrieved 2024-07-27.
- ^ Durakovic, Adnan (2021-03-29). "GE and Sembcorp Seal Sofia Transmission System Deal". Offshore Wind. Retrieved 2024-07-27.
- ^ "Project". Sofia Offshore Wind Farm. Retrieved 2024-07-27.
- ^ "The Project". www.eirgridgroup.com. Archived from the original on 2019-05-14. Retrieved 2019-05-14.
- ^ "NKT confirms turnkey power cable order for East Anglia THREE offshore wind farm". www.nkt.com. Retrieved 2024-07-27.
- ^ "East Anglia THREE". ScottishPower Renewables. Retrieved 2024-07-27.
- ^ "SuedOstLink: First award of contract for plastic-insulated underground cable for 525 kilovolts". www.50hertz.com. Archived from the original on 2020-05-10. Retrieved 2020-05-08.
- ^ a b "Hornsea 3 | Hitachi Energy". www.hitachienergy.com. Retrieved 2024-07-27.
- ^ a b Sagar, Vidya (2022-07-15). "Aibel, Hitachi Energy awarded Ørsted's Hornsea 3 offshore wind contract". NS Energy. Retrieved 2024-07-27.
- ^ a b "Hornsea 3 Offshore Wind Farm, North Sea". Power Technology. Retrieved 2024-07-27.
- ^ "EuroAsia Interconnector Project". EuroAsia Interconnector. Archived from the original on 30 January 2016. Retrieved 24 January 2016.
- ^ "EU PCI 2013 - see Cyprus" (PDF). EU Projects of Common Interest. European Commission. Archived (PDF) from the original on 14 January 2016. Retrieved 24 January 2016.
- ^ "The EuroAfrica Interconnector". Archived from the original on 2018-03-08. Retrieved 2018-03-07.
- ^ "Electricity Cable Aims to Link Cyprus, Egypt, Greece, Bloomberg, February 8, 2017". Bloomberg News. 8 February 2017. Archived from the original on 2018-02-04. Retrieved 2018-03-07.
- ^ "EuroAfrica 2,000MW cable boosts Egypt-Cyprus ties, Financial Mirror February 8, 2017". 8 February 2017. Archived from the original on February 4, 2018. Retrieved March 7, 2018.
- ^ "EEHC, Euro Africa Company sign MoU to conduct a feasibility study to link Egypt, Cyprus, Greece, Daily News Egypt, February 6, 2017". 6 February 2017. Archived from the original on March 30, 2019. Retrieved March 7, 2018.
- ^ a b "DolWin4 & BorWin4". offshore.amprion.net (in German). Retrieved 2024-07-28.
- ^ a b "Prysmian awarded more than €800M for two offshore wind farm grid connection cable systems in Germany | Prysmian". www.prysmian.com. Retrieved 2024-07-28.
- ^ "Start bouw converterstation – Net op zee IJmuiden Ver Alpha". TenneT (in Dutch). Retrieved 2024-07-27.
- ^ a b "Net op zee-projecten Sloegebied". TenneT (in Dutch). Retrieved 2024-07-27.
- ^ a b Ellichipuram, Umesh (2023-03-06). "TenneT gives €1.8bn offshore cable contracts to Prysmian and NKT". Power Technology. Retrieved 2024-07-27.
- ^ "Net op zee IJmuiden Ver Beta". TenneT (in Dutch). Retrieved 2024-07-27.
- ^ a b c "NKT awarded record orders for world's first 525 kV XLPE HVDC submarine cable projects for offshore wind". www.nkt.com. Retrieved 2024-07-27.
- ^ "Net op zee IJmuiden Ver Gamma". TenneT (in Dutch). Retrieved 2024-07-27.
- ^ "Eastern HVDC Link". NS Energy. Retrieved 2024-07-27.
- ^ Jamie.Billington@mandogroup.com (2024-05-22). "Western Isles". SSEN Transmission. Retrieved 2024-07-27.
- ^ "FAB Link". Fab Link. Archived from the original on 20 January 2016. Retrieved 3 January 2016.
- ^ "Alderney Renewable Energy". FAB - Alderney Renewable Energy. ARE. Archived from the original on 20 January 2016. Retrieved 3 January 2016.
- ^ "Net op zee Nederwiek 2". TenneT (in Dutch). Retrieved 2024-07-27.
- ^ a b "BalWin1 & BalWin2". offshore.amprion.net (in German). Retrieved 2024-07-28.
- ^ a b "Prysmian selected as preferred bidder for BalWin1, BalWin2 and DC34 power transmission cable projects". www.amprion.net. 2023-08-22. Retrieved 2024-07-28.
- ^ Latief, Yusuf (2024-02-12). "Tyrrhenian Link interconnection secures final financing". Smart Energy International. Retrieved 2024-02-27.
- ^ "New connection: Adriatic Link | Terna Driving Energy - Terna spa". www.terna.it. Retrieved 2024-02-27.
- ^ "News on trial operations of LitPol Link". LitPol Link News. LitPol-link.com. Archived from the original on 11 January 2016. Retrieved 8 January 2016.
- ^ "SSE PD in Scotland". Western Isles. SSE Power Distribution. Archived from the original on 5 March 2016. Retrieved 3 January 2016.
- ^ "Shetland Windfarm". Viking Energy - Timeline. Viking Energy. Archived from the original on 3 March 2016. Retrieved 31 December 2015.
- ^ James A. Besha, The historic Mechanicville Hydroelectric Station part 2, IEEE INDUSTRY APPLICATIONS MAGAZINE Mar/Apr 2007, page 8
- ^ "ABB Rededicates Sylmar Converter Station". Abb.com. Archived from the original on 1 February 2009. Retrieved 16 January 2018.
- ^ "Pacific Intertie". Abb.com. Archived from the original on 2014-05-27. Retrieved 2014-05-30.
- ^ a b c Siemens HVDC Reference List Archived 2014-02-22 at the Wayback Machine, Energy.siemens.com, accessed in February 2014.
- ^ "References - ABB". New.abb.com. Archived from the original on 2 July 2016. Retrieved 16 January 2018.
- ^ "Square Butte annual report 2004" (PDF). Archived from the original (PDF) on 20 January 2016. Retrieved 25 September 2017.
- ^ "References - ABB". New.abb.com. Archived from the original on 31 May 2016. Retrieved 16 January 2018.
- ^ Fairley, Peter (April 2005). "TransÉnergie: Playing Two Power Games". MIT Technology Review. Archived from the original on 2014-08-08. Retrieved 2014-08-05.
- ^ "What is Neptune RTS?". Archived from the original on May 26, 2008. Retrieved 2008-12-19.
- ^ Westerweller T., Friedrich, K., Armonies, U., Orini, A., Parquet, D., Wehn, S., Trans Bay cable – world's first HVDC system using multilevel voltage-sourced converter, CIGRÉ session, Paris, 2010, paper reference B4-101
- ^ "IEEE PES; HVDC Systems and Trans-Bay Cable" (PDF). 16 March 2005. Archived (PDF) from the original on 8 January 2010. Retrieved 16 September 2009.
- ^ "HDVC Plus Technology provided by Siemens". 2012. Archived from the original on 17 October 2021. Retrieved 10 September 2012.
- ^ a b "AESO 2013 Long-term Transmission Plan" (PDF). Alberta Electric System Operator. January 2014. pp. 77–78. Archived from the original (PDF) on 2014-04-02.
- ^ Bachusky, Johnnie (2015-01-27). "Billion dollar transmission line is complete". Mountain View Gazette. Olds, AB. Archived from the original on 2015-02-02. Retrieved 2015-02-02.
- ^ Roberts, Stephen (July 7, 2014). "Muskrat Falls work well underway in Forteau". Northern Pen. St. Anthony: Transcontinental Media G.P. Archived from the original on July 17, 2014. Retrieved 2014-07-14.
- ^ "Awarded Contracts: Muskrat Falls Generation and Labrador-Island Link". Nalcor Energy. Archived from the original on 2014-08-10. Retrieved 2014-07-26.
CD0501 Supply and Install Converter Stations and Transition Compounds 19-Jun-2014
- ^ "ABB awarded $400 million order for Maritime Link power project in Canada" (Press release). Zurich, Switzerland: ABB. July 9, 2014. Archived from the original on 2014-07-13. Retrieved 2014-07-14.
- ^ "Maritime Link Infrastructure". Emera Newfoundland and Labrador. 2014. Archived from the original on 2014-07-14. Retrieved 2014-07-14.
- ^ "4.1.3". Maritime Link Environmental Assessment Report (PDF) (Report). Emera Newfoundland and Labrador. January 10, 2013. Archived (PDF) from the original on 2014-07-28. Retrieved 2014-07-25.
- ^ "Maritime Link construction underway in western Newfoundland". CBC News. 2014-11-27. Archived from the original on 2014-12-09. Retrieved 2014-11-27.
- ^ "New England Clean Power Link". www.necplink.com. Retrieved 2023-06-15.
- ^ "Scott renews hope in billion-dollar underwater powerline | Vermont Business Magazine". vermontbiz.com. Retrieved 2023-06-15.
- ^ "NECPL Submarine Cable Installation" (PDF). New England Clean Power Link: Project Development Portal. TDI New England. 2014-10-09. Archived (PDF) from the original on 2016-01-20. Retrieved 2014-12-30.
- ^ "About the Project | New England Clean Power Link Project". Retrieved 2024-07-29.
- ^ "BLM/Western publish fifth EIS update newsletter" (Press release). Transwest Express LLC. 2014-11-26. Archived from the original on 2015-02-25. Retrieved 2014-12-30.
- ^ "Delivering Wyoming wind energy to the West". TransWest Express Transmission Project. TransWest Express LLC. 2014. Archived from the original on 2014-08-08. Retrieved 2014-08-05.
- ^ "Global Transmission Report : TransWest Express Project, US". 6 January 2017. Archived from the original on 2 February 2017. Retrieved 22 January 2017.
- ^ Kuykendall, Dia (2023-06-14). "Grain Belt Express Approved by Kansas Corporation Commission". Grain Belt Express. Retrieved 2023-06-15.
- ^ "SOO Green HVDC Link". SOO Green HVDC Link. Direct Connect Development Company. 2020. Archived from the original on 2021-06-27. Retrieved 2021-06-15.
- ^ "Clean Path New York | Our Clean Energy Future". Clean Path |. 2021-04-23. Retrieved 2021-12-17.
- ^ "Home". TDI CHPExpress. Retrieved 2021-12-17.
- ^ "About the NECEC". New England Clean Energy Connect. Retrieved 2023-06-15.
- ^ "SunZia Wind and Transmission". Pattern Energy. Retrieved 2023-06-15.
- ^ "References - ABB". New.abb.com. Archived from the original on 5 January 2018. Retrieved 16 January 2018.
- ^ a b "Technical benefits of HVDC lines and experience of HVDC projects: Brazil, China, and perspectives in Latin America" (PDF). Archived (PDF) from the original on 2021-05-09. Retrieved 2021-05-09.
- ^ [2] Archived May 24, 2011, at the Wayback Machine
- ^ "Eel River". abb.com. Archived from the original on 2013-12-12. Retrieved 2013-12-06.
- ^ "News" (PDF). Nbpower.com. Archived (PDF) from the original on 12 December 2013. Retrieved 25 September 2017.
- ^ "Châteauguay". abb.com. Archived from the original on 2014-05-02. Retrieved 2014-05-02.
- ^ "ABB to upgrade transmission control for vital North American power interconnector". abb.com. Archived from the original on 2014-05-02. Retrieved 2014-05-02.
- ^ "ABB Oklaunion - ABB HVDC Reference Projects in North America (HVDC References)". abb.com. Archived from the original on 2016-01-20. Retrieved 2015-04-20.
- ^ "ABB awarded $60 million HVDC order to support grid reliability in Texas". abb.com. Archived from the original on 2013-12-12. Retrieved 2013-12-06.
- ^ "Blackwater". abb.com. Archived from the original on 2014-05-02. Retrieved 2014-05-02.
- ^ "ABB to upgrade control and valve cooling system for HVDC station in New Mexico". abb.com. Archived from the original on 2014-05-02. Retrieved 2014-05-02.
- ^ "Highgate". abb.com. Archived from the original on 2014-05-02. Retrieved 2014-05-02.
- ^ "HVDC Transformers- details". Siemens. Archived from the original on August 9, 2011. Retrieved 2008-12-19.
- ^ "Brazil-Argentina HVDC Interconnection". abb.com. Archived from the original on 2013-12-19. Retrieved 2013-12-19.
- ^ [3] Archived November 21, 2008, at the Wayback Machine
- ^ "ABB Group. Leading digital technologies for industry". Archived from the original on 27 June 2009. Retrieved 2009-06-27.
{{cite web}}
: CS1 maint: bot: original URL status unknown (link) - ^ "THE SECOND 1 x 500 MW HVDC BACK-TO-BACK INTERCONNECTION AT VIZAG" (PDF). 2005-09-29. Archived from the original (PDF) on February 21, 2007. Retrieved 2008-12-20.
- ^ "Lingbao II". abb.com. Archived from the original on 2014-05-02. Retrieved 2014-05-02.
- ^ "ABB wins orders worth $8-million to upgrade HVDC station in China". abb.com. Archived from the original on 2014-05-02. Retrieved 2014-05-02.
- ^ "APPLICATION OF THE GRID POWER FLOW CONTROLLER (GPFC) IN A BACK TO BACK PROJECT- details" (PDF). Siemens. Archived (PDF) from the original on 2011-07-19. Retrieved 2009-09-29.
- ^ "Archived copy" (PDF). Archived from the original (PDF) on 2011-05-31. Retrieved 2009-03-24.
{{cite web}}
: CS1 maint: archived copy as title (link) - ^ [4] [permanent dead link ]
- ^ "Rio Madeira". abb.com. Archived from the original on 2011-12-06. Retrieved 2012-07-24.
- ^ "ABB wins $540-million order in Brazil for world's longest power transmission link". abb.com. Archived from the original on 2013-12-12. Retrieved 2013-12-06.
- ^ "Designing Madeira Transmission System - Transmission content from TDWorld". tdworld.com. Archived from the original on 2013-12-11. Retrieved 2013-12-06.
- ^ A remarkable journey - Transportation of the world's largest HVDC transformers. YouTube. 20 June 2012. Archived from the original on 2021-12-21.
- ^ "The Rio Madeira HVDC System – Design aspects of Bipole 1 and the connector to Acre-Rondônia". Search-ext.abb.com. Archived from the original on 12 December 2013. Retrieved 25 September 2017.
- ^ Kohnstam, Peter (April 22, 2013). "High Voltage Direct Current Transmission" (PDF). Energy.gov. Archived (PDF) from the original on October 31, 2019. Retrieved October 31, 2019.
- ^ "Siemens HVDC technology to transmit eco-friendly electric power from Georgia to Turkey : Press release" (PDF). Alstom.com. Archived from the original (PDF) on 5 October 2011. Retrieved 16 January 2018.
- ^ "Mackinac". abb.com. Archived from the original on 2013-02-21. Retrieved 2013-03-30.
- ^ "References - ABB". New.abb.com. Archived from the original on 5 March 2018. Retrieved 16 January 2018.
- ^ a b "HVDC Advances in the Russia - Substations content from TDWorld". Tdworld.com. Archived from the original on 2014-02-21. Retrieved 2014-02-05.
- ^ "First Electricity Link Between Germany and Belgium Commissioned". Endeavor Business Media, LLC (T&D World). Archived from the original on 2020-11-12. Retrieved 2021-02-17.
- ^ "Electrical interconnection between Baixas - Santa Llogaia | Drupal". www.inelfe.eu. Retrieved 2023-04-09.
- ^ "The electricity interconnection across the Biscay Gulf | Drupal". www.inelfe.eu. Retrieved 2023-04-09.
Sources
[edit]- Vijay K. Sood (31 May 2004). HVDC and FACTS Controllers: Applications Of Static Converters In Power Systems. Springer-Verlag. p. 2. ISBN 978-1-4020-7890-3.